In 2025, GS Housing supplied 132 flat pack container house units for an employee dormitory project in Indonesia. The units were combined into two-storey modular dormitory buildings with finished bedrooms and private bathroom facilities, providing dedicated workforce accommodation for company employees and project personnel.
In 2025, GS Housing supplied 18 flat pack container house units for the Arua Enyau water supply project in Uganda. The units were arranged in single-storey horizontally connected rows to provide a combined construction site accommodation and project office facility for the construction team.
En 2025, GS Housing a fourni 1 158 modules dans le cadre du projet de logement du camp minier IPIP en Indonésie. Ces modules ont permis de créer un camp modulaire de grande envergure comprenant des logements pour le personnel, des bureaux, des espaces de restauration, des installations médicales, des espaces de loisirs et des infrastructures annexes.
En 2025, GS Housing a fourni 75 modules de bureaux en conteneurs à monter sur place destinés à un centre de recherche en Éthiopie. Ces modules ont été assemblés pour former un bâtiment de trois étages comprenant des espaces de bureaux et de laboratoires, un atrium intérieur et des couloirs de liaison, réalisé pour le compte de China Communications Construction.
En 2025, GS Housing a fourni 18 modules de maisons en conteneurs standard prêts à monter dans le cadre d'un projet de logement en Argentine. Ces modules ont permis de constituer un complexe modulaire de plain-pied pouvant accueillir entre 18 et 36 personnes environ, les installations d'eau et d'électricité ayant été préparées en usine.
À la suite de l'incendie survenu en novembre 2025 à Wang Fuk Court, GS Housing a fourni six modules standard afin de mettre en place deux salles de classe d'urgence à Tai Po dans un délai de construction très court de six jours — soit un jour avant la date butoir du 15 décembre.











