QUALITY ASSURANCE
အရည်အသွေး စီမံခန့်ခွဲမှု
From material inspection to production checks and final pre-shipment inspection, GS Housing manages quality throughout the modular building manufacturing process.

Our Quality Control Process
Quality checks from design review and incoming materials through production and final inspection.
Key Quality Control Areas
Critical production processes are controlled through defined standards, inspections and documented test results.

01. Structural Welding
Welding preparation, process parameters and completed welds are inspected to support structural safety and reliable connections.
✓ Pre-welding checks
✓ Process parameter control
✓ Post-weld inspection
02. Surface Treatment
Surface preparation and powder coating are controlled to support corrosion resistance, durability and appearance.
✓ Surface preparation
✓ Powder coating
✓ Thickness & finish inspection


03. Plumbing & Electrical Inspection
Key plumbing and electrical installations are checked and tested before concealed works and final assembly.
✓ Installation checks
✓ Pressure testing
✓ Electrical testing
04. Assembly & Finishing Inspection
Flooring, panel installation and finishing details are checked to support consistent assembly quality and final appearance.
✓ Flooring & surface finish
✓ Panel installation
✓ Finishing details

Traceability Throughout Production
Material, production, inspection and delivery records are linked throughout the manufacturing process to support project traceability.

Project and product identification connects material information, production records, inspection results and delivery documentation throughout the manufacturing process.
✓ Material identification
✓ Production records
✓ Inspection results
✓ Delivery documentation
Non-Conformance Control
Quality Issues Are Controlled Before Release
When a quality issue is identified, the affected item is immediately isolated and reviewed before release. Corrective actions address the current issue, while root-cause analysis and preventive measures help reduce the risk of recurrence.
Inspection & Test Planning
Inspection Requirements Are Defined Before Production
Inspection activities are planned according to project requirements, defining what is inspected, when inspections take place, applicable acceptance criteria and required quality records.
For GS Housing modular units, inspection planning focuses on structural strength, connection reliability, standardized interfaces and durability.
Standards & Certifications
Project Standards and Certification Support
Applicable standards, compliance requirements and certification documentation are reviewed according to the destination market and project scope.
International Certifications & Compliance
GS Housing complies with internationally recognized standards for structural manufacturing, product performance, and quality management, supporting reliable modular building solutions for global projects.

















