项目概述
项目概述
Project Name: Emergency Modular Hospital in Lezhi
Location: Sanli Community, Lezhi County, Sichuan Province, China
Construction Period: 3 days rapid deployment
Building Type: Flat Pack Container House / Modular Isolation Hospital
Structure Type: Modular emergency healthcare facility
Total Units: 862 modular isolation units
Usage: COVID-19 isolation hospital / Emergency quarantine center / Public health response facility


GS Housing Supports Emergency Epidemic Response
GS Housing Supports Emergency Epidemic Response
During the COVID-19 outbreak, Lezhi County urgently required large-scale isolation capacity to support rapid epidemic control and public health protection.
GS Housing Group responded to the emergency demand by delivering a modular construction solution based on flat pack container house systems.
Within an extremely short construction period of only 3 days, a total of 862 modular isolation units were deployed and assembled, forming a functional emergency isolation facility.
This project demonstrates how modular construction enables governments to respond quickly to large-scale public health emergencies.
1. Standardized Flat Pack Container System
The project used standardized modular container units, enabling factory prefabrication, consistent quality, and rapid large-scale deployment.
2. Ultra-Fast Deployment Capability
Through coordinated production, logistics, and on-site assembly, 862 units were completed within 3 days, achieving rapid emergency capacity expansion.
3. Scalable Modular Architecture
The system allows flexible configuration and expansion depending on isolation demand and site conditions.
4. Functional Integration
The modular hospital system supports multiple functions, including:
- Isolation wards
- Medical support areas
- Staff operation zones
- Logistics and supply areas


Project Functional Layout
Project Functional Layout
1. Core Functional Areas
- Modular isolation units (862 total)
- Medical observation zones
- Staff working areas
- Material storage zones
- Management and control areas
2. Epidemic Prevention Design Features
- Independent isolation unit layout
- Controlled circulation zoning system
- Hygienic and easy-to-disinfect materials
- Ventilation and infection control design
3. Basic Facility Configuration
- Standardized modular bed layout
- Electrical and lighting systems
- Ventilation and insulation system
- Sanitation and hygiene facilities
Conclusion
Conclusion
The Lezhi Emergency Modular Hospital project demonstrates GS Housing’s capability to rapidly deploy large-scale modular healthcare infrastructure under emergency conditions.
With 862 modular isolation units delivered within just 3 days, the project significantly expanded local isolation capacity and supported COVID-19 epidemic prevention and control efforts.
This case highlights the speed, scalability, and emergency responsiveness of modular construction systems in public health infrastructure.