Planning remote workforce accommodation starts with the site, not the building catalogue. See how climate, logistics and installation shape the modular camp.
This guide explains the essential facilities in an oilfield accommodation camp, from sleeping and dining areas to sanitation, medical, safety, utility, and recreation spaces. It also highlights planning considerations for remote operations.
A modular camp shifts a significant portion of camp building work into the factory, allowing production, site preparation and delivery to progress in parallel on large projects.
A 1,000-worker camp is more than dormitories. Learn how to plan integrated workforce accommodation with offices, dining, medical and utility facilities.
This guide explains how prefabricated container houses are prepared and shipped. It compares transport methods and cost factors that affect module design, installation, and project planning.
GS Housing supplied 47 flat pack container house units for the Guinea Conakry Port Expansion Phase II project, creating two-storey modular site buildings.











