{"id":8194,"date":"2026-06-03T10:33:58","date_gmt":"2026-06-03T10:33:58","guid":{"rendered":"https:\/\/gshousing.com\/?p=8194"},"modified":"2026-06-29T10:37:53","modified_gmt":"2026-06-29T10:37:53","slug":"uzbekistan-modular-buildings-project-new-tashkent","status":"publish","type":"post","link":"https:\/\/gshousing.com\/pt\/uzbekistan-modular-buildings-project-new-tashkent\/","title":{"rendered":"Modular Buildings Uzbekistan Project | 182 Units New Tashkent Construction"},"content":{"rendered":"<div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 fusion-flex-container has-pattern-background has-mask-background nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"max-width:1248px;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:20px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-title title fusion-title-1 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-font-size:2em;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;font-size:1em;\"><h2><strong><b>Project Overview<\/b><\/strong><\/h2><\/h2><\/div><div class=\"fusion-text fusion-text-1\"><p>The Uzbekistan Modular Buildings Project is developed under the New Tashkent national urban expansion strategy, which aims to accelerate modern infrastructure development in Central Asia.<\/p>\n<p>The project delivers <strong>182 prefabricated modular buildings<\/strong>\u00a0designed and manufactured by Orient GS International Engineering Co., Ltd., providing a complete building system for large-scale infrastructure support.<\/p>\n<p>These modular units are not independent structures. They are part of a unified <strong><a href=\"https:\/\/gshousing.com\/pt\/products\/\">modular building<\/a> system<\/strong>, integrating accommodation, office space, dining facilities, laundry rooms, stair modules, and corridor systems into a complete construction solution.<\/p>\n<p>All units are manufactured in the <strong>GS Housing factory<\/strong>, where structural fabrication, insulation installation, interior finishing, and system testing are completed before export.<\/p>\n<p>This approach represents a fully industrialized construction model based on factory production and on-site assembly.<\/p>\n<\/div><div class=\"fusion-title title fusion-title-2 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-font-size:2em;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;font-size:1em;\"><h2><strong><b>Project Key Facts<\/b><\/strong><\/h2><\/h2><\/div><div class=\"fusion-text fusion-text-2\"><ul>\n<li><strong>Project Name:<\/strong>Uzbekistan Modular Buildings Project<\/li>\n<li><strong>Location:<\/strong>New Tashkent, Uzbekistan<\/li>\n<li><strong>Total Units:<\/strong>182 modular buildings<\/li>\n<li><strong>Structure System:<\/strong>Prefabricated cold-formed steel modular system<\/li>\n<li><strong>Supplier:<\/strong>Orient GS International Engineering Co., Ltd.<\/li>\n<li><strong>Application:<\/strong>Accommodation, office, dining, service facilities<\/li>\n<li><strong>Design Life:<\/strong>20 years structural lifespan<\/li>\n<li><strong>Production Base:<\/strong>Foshan, China<\/li>\n<\/ul>\n<p>Each modular unit is designed with standardized dimensions to ensure transport efficiency and installation compatibility.<\/p>\n<\/div><div class=\"fusion-title title fusion-title-3 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-font-size:32px;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;font-size:1em;\"><div style=\"text-align: left;\">\n<h2><strong>Project Background<\/strong><\/h2>\n<\/div><\/h2><\/div><div class=\"fusion-text fusion-text-3\"><p>The project is part of the New Tashkent development initiative, a national strategy to build a modern urban district east of the existing capital.<\/p>\n<p>Due to rapid urbanization, traditional reinforced concrete construction methods are no longer sufficient to meet fast infrastructure delivery requirements.<\/p>\n<p>As a result, <strong>prefabricated modular buildings<\/strong>\u00a0have become a key solution for accelerating construction efficiency while maintaining structural stability.<\/p>\n<p>The 182 modular units in this project are manufactured in parallel production lines, enabling simultaneous fabrication of structural frames, wall systems, electrical installation, and interior finishes.<\/p>\n<p>This significantly reduces construction time and improves project coordination efficiency.<\/p>\n<\/div><div class=\"fusion-image-carousel fusion-image-carousel-auto fusion-image-carousel-1\"><div class=\"awb-carousel awb-swiper awb-swiper-carousel awb-carousel--carousel awb-swiper-dots-position-bottom\" data-layout=\"carousel\" data-autoplay=\"no\" data-autoplayspeed=\"2500\" data-autoplaypause=\"no\" data-columns=\"5\" data-columnsmedium=\"1\" data-columnssmall=\"1\" data-itemmargin=\"13\" data-itemwidth=\"180\" data-touchscroll=\"no\" data-freemode=\"no\" data-imagesize=\"auto\" data-scrollitems=\"0\" data-centeredslides=\"no\" data-rotationangle=\"50\" data-depth=\"100\" data-speed=\"500\" data-shadow=\"no\" data-pagination=\"bullets\" style=\"--awb-dots-align:center;\"><div class=\"swiper-wrapper awb-image-carousel-wrapper fusion-flex-align-items-center\"><div class=\"swiper-slide\"><div class=\"fusion-carousel-item-wrapper\"><div class=\"fusion-image-wrapper hover-type-none\"><img decoding=\"async\" width=\"700\" height=\"448\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-exterior-installation-construction-site-workers-inspection.webp\" class=\"attachment-full size-full lazyload\" alt=\"modular buildings exterior installation construction site workers inspection\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27700%27%20height%3D%27448%27%20viewBox%3D%270%200%20700%20448%27%3E%3Crect%20width%3D%27700%27%20height%3D%27448%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-exterior-installation-construction-site-workers-inspection.webp\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-exterior-installation-construction-site-workers-inspection-200x128.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-exterior-installation-construction-site-workers-inspection-400x256.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-exterior-installation-construction-site-workers-inspection-600x384.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-exterior-installation-construction-site-workers-inspection.webp 700w\" data-sizes=\"auto\" \/><\/div><\/div><\/div><div class=\"swiper-slide\"><div class=\"fusion-carousel-item-wrapper\"><div class=\"fusion-image-wrapper hover-type-none\"><img decoding=\"async\" width=\"700\" height=\"448\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/steel-frame-modular-buildings-external-staircase-system-installation-view.webp\" class=\"attachment-full size-full lazyload\" alt=\"steel frame modular buildings external staircase system installation view\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27700%27%20height%3D%27448%27%20viewBox%3D%270%200%20700%20448%27%3E%3Crect%20width%3D%27700%27%20height%3D%27448%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/steel-frame-modular-buildings-external-staircase-system-installation-view.webp\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/steel-frame-modular-buildings-external-staircase-system-installation-view-200x128.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/steel-frame-modular-buildings-external-staircase-system-installation-view-400x256.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/steel-frame-modular-buildings-external-staircase-system-installation-view-600x384.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/steel-frame-modular-buildings-external-staircase-system-installation-view.webp 700w\" data-sizes=\"auto\" \/><\/div><\/div><\/div><div class=\"swiper-slide\"><div class=\"fusion-carousel-item-wrapper\"><div class=\"fusion-image-wrapper hover-type-none\"><img decoding=\"async\" width=\"700\" height=\"448\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/prefabricated-modular-buildings-facade-wall-panels-window-installation-detail.webp\" class=\"attachment-full size-full lazyload\" alt=\"prefabricated modular buildings facade wall panels window installation detail\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27700%27%20height%3D%27448%27%20viewBox%3D%270%200%20700%20448%27%3E%3Crect%20width%3D%27700%27%20height%3D%27448%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/prefabricated-modular-buildings-facade-wall-panels-window-installation-detail.webp\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/prefabricated-modular-buildings-facade-wall-panels-window-installation-detail-200x128.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/prefabricated-modular-buildings-facade-wall-panels-window-installation-detail-400x256.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/prefabricated-modular-buildings-facade-wall-panels-window-installation-detail-600x384.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/prefabricated-modular-buildings-facade-wall-panels-window-installation-detail.webp 700w\" data-sizes=\"auto\" \/><\/div><\/div><\/div><\/div><div class=\"awb-swiper-button awb-swiper-button-prev\"><i class=\"awb-icon-angle-left\" aria-hidden=\"true\"><\/i><\/div><div class=\"awb-swiper-button awb-swiper-button-next\"><i class=\"awb-icon-angle-right\" aria-hidden=\"true\"><\/i><\/div><\/div><\/div><div class=\"fusion-title title fusion-title-4 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-font-size:32px;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;font-size:1em;\"><h2><strong><b>Modular Building System Design<\/b><\/strong><\/h2><\/h2><\/div><div class=\"fusion-text fusion-text-4\"><p>The project is based on a standardized <strong>modular building system<\/strong>\u00a0using galvanized cold-formed steel structures.<\/p>\n<p>Each module functions as an independent structural unit that can be combined into larger building systems.<\/p>\n<p>Key structural features include:<\/p>\n<ul>\n<li>High-strength galvanized steel frame<\/li>\n<li>Factory-installed wall and roof systems<\/li>\n<li>Integrated electrical and piping systems<\/li>\n<li>Standardized container-based transport dimensions<\/li>\n<li>Modular connection design for rapid installation<\/li>\n<\/ul>\n<p>These features ensure consistency across all 182 units while allowing flexible configuration on-site.<\/p>\n<p>The system supports large-scale deployment in different functional layouts depending on project requirements.<\/p>\n<\/div><div class=\"fusion-title title fusion-title-5 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-font-size:32px;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;font-size:1em;\"><div style=\"text-align: left;\">\n<h2><strong><b>Construction and Installation Process<\/b><\/strong><\/h2>\n<\/div><\/h2><\/div><div class=\"fusion-text fusion-text-5\"><p>The construction process follows a fully industrialized workflow:<\/p>\n<ol>\n<li><strong><b>Factory Production<\/b><\/strong>-All 182 modular buildings are produced in the Foshan factory under controlled industrial conditions.<\/li>\n<li><strong><b>Quality Inspection<\/b><\/strong>-Each module undergoes structural, electrical, and enclosure system testing before shipment.<\/li>\n<li><strong><b>Transportation<\/b><\/strong>-Units are shipped to Uzbekistan through multimodal logistics routes.<\/li>\n<li><strong><b>On-Site Assembly<\/b><\/strong>-Crane lifting and standardized connection systems are used for installation.<\/li>\n<li><strong><b>System Integration<\/b><\/strong>-Modules are combined into a complete modular building system for full project operation.<\/li>\n<\/ol>\n<p>This process significantly reduces on-site construction workload compared to traditional building methods.<\/p>\n<\/div><div class=\"fusion-image-carousel fusion-image-carousel-auto fusion-image-carousel-2\"><div class=\"awb-carousel awb-swiper awb-swiper-carousel awb-carousel--carousel awb-swiper-dots-position-bottom\" data-layout=\"carousel\" data-autoplay=\"no\" data-autoplayspeed=\"2500\" data-autoplaypause=\"no\" data-columns=\"5\" data-columnsmedium=\"1\" data-columnssmall=\"1\" data-itemmargin=\"13\" data-itemwidth=\"180\" data-touchscroll=\"no\" data-freemode=\"no\" data-imagesize=\"auto\" data-scrollitems=\"0\" data-centeredslides=\"no\" data-rotationangle=\"50\" data-depth=\"100\" data-speed=\"500\" data-shadow=\"no\" data-pagination=\"bullets\" style=\"--awb-dots-align:center;\"><div class=\"swiper-wrapper awb-image-carousel-wrapper fusion-flex-align-items-center\"><div class=\"swiper-slide\"><div class=\"fusion-carousel-item-wrapper\"><div class=\"fusion-image-wrapper hover-type-none\"><img decoding=\"async\" width=\"700\" height=\"448\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-office-room-interior-workspace-furniture-layout-prefabricated-unit.webp\" class=\"attachment-full size-full lazyload\" alt=\"modular office room interior workspace furniture layout prefabricated unit\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27700%27%20height%3D%27448%27%20viewBox%3D%270%200%20700%20448%27%3E%3Crect%20width%3D%27700%27%20height%3D%27448%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-office-room-interior-workspace-furniture-layout-prefabricated-unit.webp\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-office-room-interior-workspace-furniture-layout-prefabricated-unit-200x128.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-office-room-interior-workspace-furniture-layout-prefabricated-unit-400x256.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-office-room-interior-workspace-furniture-layout-prefabricated-unit-600x384.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-office-room-interior-workspace-furniture-layout-prefabricated-unit.webp 700w\" data-sizes=\"auto\" \/><\/div><\/div><\/div><div class=\"swiper-slide\"><div class=\"fusion-carousel-item-wrapper\"><div class=\"fusion-image-wrapper hover-type-none\"><img decoding=\"async\" width=\"700\" height=\"448\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-interior-corridor-lighting-ceiling-panel-installation-system.webp\" class=\"attachment-full size-full lazyload\" alt=\"modular buildings interior corridor lighting ceiling panel installation system\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27700%27%20height%3D%27448%27%20viewBox%3D%270%200%20700%20448%27%3E%3Crect%20width%3D%27700%27%20height%3D%27448%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-interior-corridor-lighting-ceiling-panel-installation-system.webp\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-interior-corridor-lighting-ceiling-panel-installation-system-200x128.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-interior-corridor-lighting-ceiling-panel-installation-system-400x256.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-interior-corridor-lighting-ceiling-panel-installation-system-600x384.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-interior-corridor-lighting-ceiling-panel-installation-system.webp 700w\" data-sizes=\"auto\" \/><\/div><\/div><\/div><div class=\"swiper-slide\"><div class=\"fusion-carousel-item-wrapper\"><div class=\"fusion-image-wrapper hover-type-none\"><img decoding=\"async\" width=\"700\" height=\"448\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/prefabricated-modular-buildings-interior-corridor-connection-walkway-system.webp\" class=\"attachment-full size-full lazyload\" alt=\"prefabricated modular buildings interior corridor connection walkway system\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27700%27%20height%3D%27448%27%20viewBox%3D%270%200%20700%20448%27%3E%3Crect%20width%3D%27700%27%20height%3D%27448%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/prefabricated-modular-buildings-interior-corridor-connection-walkway-system.webp\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/prefabricated-modular-buildings-interior-corridor-connection-walkway-system-200x128.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/prefabricated-modular-buildings-interior-corridor-connection-walkway-system-400x256.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/prefabricated-modular-buildings-interior-corridor-connection-walkway-system-600x384.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/prefabricated-modular-buildings-interior-corridor-connection-walkway-system.webp 700w\" data-sizes=\"auto\" \/><\/div><\/div><\/div><\/div><div class=\"awb-swiper-button awb-swiper-button-prev\"><i class=\"awb-icon-angle-left\" aria-hidden=\"true\"><\/i><\/div><div class=\"awb-swiper-button awb-swiper-button-next\"><i class=\"awb-icon-angle-right\" aria-hidden=\"true\"><\/i><\/div><\/div><\/div><div class=\"fusion-title title fusion-title-6 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-font-size:32px;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;font-size:1em;\"><div style=\"text-align: left;\">\n<h2><strong><b>Functional Layout of Modular Buildings<\/b><\/strong><\/h2>\n<\/div><\/h2><\/div><div class=\"fusion-text fusion-text-6\"><p>The 182 modular units are divided into multiple functional categories:<\/p>\n<ul>\n<li>Accommodation modules for living spaces<\/li>\n<li>Office modules for project coordination<\/li>\n<li>Dining modules for centralized catering<\/li>\n<li>Laundry modules for daily service support<\/li>\n<li>Stair modules for vertical circulation<\/li>\n<li>Corridor modules for building connectivity<\/li>\n<\/ul>\n<p>Each module is prefabricated but designed for seamless integration into a unified structure.<\/p>\n<p>This ensures the entire system operates as a coordinated architectural environment.<\/p>\n<\/div><div class=\"fusion-title title fusion-title-7 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-font-size:32px;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;font-size:1em;\"><div style=\"text-align: left;\">\n<h2><strong><b>Project Cooperation Model<\/b><\/strong><\/h2>\n<\/div><\/h2><\/div><div class=\"fusion-text fusion-text-7\"><p>The project follows a cross-border cooperation structure between Chinese manufacturing and Uzbekistan engineering implementation.<\/p>\n<ul>\n<li>Manufacturing &amp; Export: Orient GS International Engineering Co., Ltd.<\/li>\n<li>Factory Base: <a href=\"https:\/\/gshousing.com\/pt\/about\/\"><strong>GS Housing<\/strong><\/a> Foshan production facility<\/li>\n<li>On-Site Construction: Hold Brothers Engineering LLC<\/li>\n<li>Responsibilities: Foundation works, lifting, installation, and commissioning<\/li>\n<\/ul>\n<p>This cooperation model ensures efficiency in production while maintaining local execution capability.<\/p>\n<\/div><div class=\"fusion-image-carousel fusion-image-carousel-auto fusion-image-carousel-3\"><div class=\"awb-carousel awb-swiper awb-swiper-carousel awb-carousel--carousel awb-swiper-dots-position-bottom\" data-layout=\"carousel\" data-autoplay=\"no\" data-autoplayspeed=\"2500\" data-autoplaypause=\"no\" data-columns=\"5\" data-columnsmedium=\"1\" data-columnssmall=\"1\" data-itemmargin=\"13\" data-itemwidth=\"180\" data-touchscroll=\"no\" data-freemode=\"no\" data-imagesize=\"auto\" data-scrollitems=\"0\" data-centeredslides=\"no\" data-rotationangle=\"50\" data-depth=\"100\" data-speed=\"500\" data-shadow=\"no\" data-pagination=\"bullets\" style=\"--awb-dots-align:center;\"><div class=\"swiper-wrapper awb-image-carousel-wrapper fusion-flex-align-items-center\"><div class=\"swiper-slide\"><div class=\"fusion-carousel-item-wrapper\"><div class=\"fusion-image-wrapper hover-type-none\"><img decoding=\"async\" width=\"700\" height=\"448\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-bathroom-interior-sanitary-facility-prefabricated-container-unit-design.webp\" class=\"attachment-full size-full lazyload\" alt=\"modular bathroom interior sanitary facility prefabricated container unit design\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27700%27%20height%3D%27448%27%20viewBox%3D%270%200%20700%20448%27%3E%3Crect%20width%3D%27700%27%20height%3D%27448%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-bathroom-interior-sanitary-facility-prefabricated-container-unit-design.webp\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-bathroom-interior-sanitary-facility-prefabricated-container-unit-design-200x128.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-bathroom-interior-sanitary-facility-prefabricated-container-unit-design-400x256.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-bathroom-interior-sanitary-facility-prefabricated-container-unit-design-600x384.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-bathroom-interior-sanitary-facility-prefabricated-container-unit-design.webp 700w\" data-sizes=\"auto\" \/><\/div><\/div><\/div><div class=\"swiper-slide\"><div class=\"fusion-carousel-item-wrapper\"><div class=\"fusion-image-wrapper hover-type-none\"><img decoding=\"async\" width=\"700\" height=\"448\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-internal-steel-staircase-connection-structure-system.webp\" class=\"attachment-full size-full lazyload\" alt=\"modular buildings internal steel staircase connection structure system\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27700%27%20height%3D%27448%27%20viewBox%3D%270%200%20700%20448%27%3E%3Crect%20width%3D%27700%27%20height%3D%27448%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-internal-steel-staircase-connection-structure-system.webp\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-internal-steel-staircase-connection-structure-system-200x128.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-internal-steel-staircase-connection-structure-system-400x256.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-internal-steel-staircase-connection-structure-system-600x384.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-internal-steel-staircase-connection-structure-system.webp 700w\" data-sizes=\"auto\" \/><\/div><\/div><\/div><div class=\"swiper-slide\"><div class=\"fusion-carousel-item-wrapper\"><div class=\"fusion-image-wrapper hover-type-none\"><img decoding=\"async\" width=\"700\" height=\"448\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-office-workspace-interior-meeting-room-container-building-layout.webp\" class=\"attachment-full size-full lazyload\" alt=\"modular office workspace interior meeting room container building layout\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27700%27%20height%3D%27448%27%20viewBox%3D%270%200%20700%20448%27%3E%3Crect%20width%3D%27700%27%20height%3D%27448%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-office-workspace-interior-meeting-room-container-building-layout.webp\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-office-workspace-interior-meeting-room-container-building-layout-200x128.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-office-workspace-interior-meeting-room-container-building-layout-400x256.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-office-workspace-interior-meeting-room-container-building-layout-600x384.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-office-workspace-interior-meeting-room-container-building-layout.webp 700w\" data-sizes=\"auto\" \/><\/div><\/div><\/div><\/div><div class=\"awb-swiper-button awb-swiper-button-prev\"><i class=\"awb-icon-angle-left\" aria-hidden=\"true\"><\/i><\/div><div class=\"awb-swiper-button awb-swiper-button-next\"><i class=\"awb-icon-angle-right\" aria-hidden=\"true\"><\/i><\/div><\/div><\/div><div class=\"fusion-title title fusion-title-8 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-font-size:32px;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;font-size:1em;\"><div style=\"text-align: left;\">\n<h2><strong>Sustainability and Reuse Concept<\/strong><\/h2>\n<\/div><\/h2><\/div><div class=\"fusion-text fusion-text-8\"><p>One of the key advantages of the modular system is its reusability.<\/p>\n<p>After completion of the New Tashkent development phase, the modular buildings can be dismantled and relocated to other construction projects.<\/p>\n<p>Steel components and metal panels can be recycled, supporting circular construction principles and reducing material waste.<\/p>\n<p>This enhances the long-term value of the <strong>modular building system<\/strong>.<\/p>\n<\/div><div class=\"fusion-title title fusion-title-9 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-font-size:32px;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;font-size:1em;\"><div style=\"text-align: left;\">\n<h2><strong><b>Product Unit Breakdown (182 Modules)<\/b><\/strong><\/h2>\n<\/div><\/h2><\/div><div class=\"fusion-text fusion-text-9\"><ul>\n<li>100 Accommodation modules<\/li>\n<li>30 Office modules<\/li>\n<li>15 Dining modules<\/li>\n<li>6 Laundry modules<\/li>\n<li>16 Stair modules<\/li>\n<li>15 Corridor modules<\/li>\n<\/ul>\n<p>All units are standardized for transportation and lifting efficiency.<\/p>\n<\/div><div class=\"fusion-image-carousel fusion-image-carousel-auto fusion-image-carousel-4\"><div class=\"awb-carousel awb-swiper awb-swiper-carousel awb-carousel--carousel awb-swiper-dots-position-bottom\" data-layout=\"carousel\" data-autoplay=\"no\" data-autoplayspeed=\"2500\" data-autoplaypause=\"no\" data-columns=\"5\" data-columnsmedium=\"1\" data-columnssmall=\"1\" data-itemmargin=\"13\" data-itemwidth=\"180\" data-touchscroll=\"no\" data-freemode=\"no\" data-imagesize=\"auto\" data-scrollitems=\"0\" data-centeredslides=\"no\" data-rotationangle=\"50\" data-depth=\"100\" data-speed=\"500\" data-shadow=\"no\" data-pagination=\"bullets\" style=\"--awb-dots-align:center;\"><div class=\"swiper-wrapper awb-image-carousel-wrapper fusion-flex-align-items-center\"><div class=\"swiper-slide\"><div class=\"fusion-carousel-item-wrapper\"><div class=\"fusion-image-wrapper hover-type-none\"><img decoding=\"async\" width=\"700\" height=\"448\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-exterior-row-units-facade-alignment-prefabricated-structure.webp\" class=\"attachment-full size-full lazyload\" alt=\"modular buildings exterior row units facade alignment prefabricated structure\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27700%27%20height%3D%27448%27%20viewBox%3D%270%200%20700%20448%27%3E%3Crect%20width%3D%27700%27%20height%3D%27448%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-exterior-row-units-facade-alignment-prefabricated-structure.webp\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-exterior-row-units-facade-alignment-prefabricated-structure-200x128.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-exterior-row-units-facade-alignment-prefabricated-structure-400x256.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-exterior-row-units-facade-alignment-prefabricated-structure-600x384.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/modular-buildings-exterior-row-units-facade-alignment-prefabricated-structure.webp 700w\" data-sizes=\"auto\" \/><\/div><\/div><\/div><div class=\"swiper-slide\"><div class=\"fusion-carousel-item-wrapper\"><div class=\"fusion-image-wrapper hover-type-none\"><img decoding=\"async\" width=\"700\" height=\"448\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/red-steel-staircase-modular-buildings-structure-external-access-system.webp\" class=\"attachment-full size-full lazyload\" alt=\"red steel staircase modular buildings structure external access system\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27700%27%20height%3D%27448%27%20viewBox%3D%270%200%20700%20448%27%3E%3Crect%20width%3D%27700%27%20height%3D%27448%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/red-steel-staircase-modular-buildings-structure-external-access-system.webp\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/red-steel-staircase-modular-buildings-structure-external-access-system-200x128.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/red-steel-staircase-modular-buildings-structure-external-access-system-400x256.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/red-steel-staircase-modular-buildings-structure-external-access-system-600x384.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/red-steel-staircase-modular-buildings-structure-external-access-system.webp 700w\" data-sizes=\"auto\" \/><\/div><\/div><\/div><div class=\"swiper-slide\"><div class=\"fusion-carousel-item-wrapper\"><div class=\"fusion-image-wrapper hover-type-none\"><img decoding=\"async\" width=\"700\" height=\"448\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/prefabricated-modular-buildings-multi-unit-row-construction-site-overview.webp\" class=\"attachment-full size-full lazyload\" alt=\"prefabricated modular buildings multi unit row construction site overview\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27700%27%20height%3D%27448%27%20viewBox%3D%270%200%20700%20448%27%3E%3Crect%20width%3D%27700%27%20height%3D%27448%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/prefabricated-modular-buildings-multi-unit-row-construction-site-overview.webp\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/prefabricated-modular-buildings-multi-unit-row-construction-site-overview-200x128.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/prefabricated-modular-buildings-multi-unit-row-construction-site-overview-400x256.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/prefabricated-modular-buildings-multi-unit-row-construction-site-overview-600x384.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/06\/prefabricated-modular-buildings-multi-unit-row-construction-site-overview.webp 700w\" data-sizes=\"auto\" \/><\/div><\/div><\/div><\/div><div class=\"awb-swiper-button awb-swiper-button-prev\"><i class=\"awb-icon-angle-left\" aria-hidden=\"true\"><\/i><\/div><div class=\"awb-swiper-button awb-swiper-button-next\"><i class=\"awb-icon-angle-right\" aria-hidden=\"true\"><\/i><\/div><\/div><\/div><div class=\"fusion-title title fusion-title-10 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-font-size:32px;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;font-size:1em;\"><div style=\"text-align: left;\">\n<h2><strong><b>Perguntas frequentes<\/b><\/strong><\/h2>\n<\/div><\/h2><\/div><div class=\"fusion-text fusion-text-10\"><p><strong>Q1: What is the lifespan of the modular buildings?<\/strong><br \/>\nThe structural system is designed for approximately 20 years of service life.<\/p>\n<p><strong>Q2: How long does transportation take?<\/strong><br \/>\nTypical delivery time from China to Uzbekistan is 20\u201330 days.<\/p>\n<p><strong>Q3: What equipment is required for installation?<\/strong><br \/>\nA crane (usually 25 tons) and standard connection tools are required.<\/p>\n<p><strong>Q4: Can modular buildings be reused?<\/strong><br \/>\nYes, all units are designed for disassembly and reuse in other projects.<\/p>\n<p>&nbsp;<\/p>\n<p>For more information, you can\u00a0<b><u><a href=\"https:\/\/gshousing.com\/pt\/contact\/\">contact us<\/a><\/u><\/b>.<\/p>\n<\/div><\/div><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":9,"featured_media":8197,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[39],"tags":[41,46],"class_list":["post-8194","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-case","tag-flat-pack-container-house","tag-worker-labor-accommodation-camps"],"_links":{"self":[{"href":"https:\/\/gshousing.com\/pt\/wp-json\/wp\/v2\/posts\/8194","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gshousing.com\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gshousing.com\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gshousing.com\/pt\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/gshousing.com\/pt\/wp-json\/wp\/v2\/comments?post=8194"}],"version-history":[{"count":3,"href":"https:\/\/gshousing.com\/pt\/wp-json\/wp\/v2\/posts\/8194\/revisions"}],"predecessor-version":[{"id":8209,"href":"https:\/\/gshousing.com\/pt\/wp-json\/wp\/v2\/posts\/8194\/revisions\/8209"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gshousing.com\/pt\/wp-json\/wp\/v2\/media\/8197"}],"wp:attachment":[{"href":"https:\/\/gshousing.com\/pt\/wp-json\/wp\/v2\/media?parent=8194"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gshousing.com\/pt\/wp-json\/wp\/v2\/categories?post=8194"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gshousing.com\/pt\/wp-json\/wp\/v2\/tags?post=8194"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}