{"id":12445,"date":"2026-09-29T03:48:12","date_gmt":"2026-09-29T03:48:12","guid":{"rendered":"https:\/\/gshousing.com\/?p=12445"},"modified":"2026-09-29T03:50:49","modified_gmt":"2026-09-29T03:50:49","slug":"gs-housing-batimat-2026-paris","status":"publish","type":"post","link":"https:\/\/gshousing.com\/pt\/gs-housing-batimat-2026-paris\/","title":{"rendered":"A GS Housing apresenta solu\u00e7\u00f5es de constru\u00e7\u00e3o modular prontas para projeto na BATIMAT 2026, em Paris"},"content":{"rendered":"<p><div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 fusion-flex-container nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"max-width:1248px;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-blend:overlay;--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:0px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-1\"><p>BATIMAT 2026 is now underway in Paris, bringing together professionals from the building and construction industry to exchange ideas, compare solutions, and discuss future project needs. During the exhibition, GS Housing is welcoming visitors at <strong>Stand H1-A030<\/strong> to discuss<a href=\"https:\/\/gshousing.com\/pt\/products\/\"><strong> solu\u00e7\u00f5es de constru\u00e7\u00e3o modulares<\/strong> <\/a>for construction sites, workforce accommodation, project camps, temporary offices, sanitary facilities, and other site support spaces.<\/p>\n<p>As construction projects face pressure from labor availability, tight schedules, limited site access, and changing space requirements, many visitors are looking for building systems that can move faster from planning to use. For GS Housing, BATIMAT 2026 is not only a product display opportunity, but also a platform for discussing how modular buildings can be planned around real site conditions, project stages, and long-term use.<\/p>\n<p><img decoding=\"async\" class=\"lazyload alignnone size-full wp-image-12448\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-batimat-2026-paris-stand-h1-a030.webp\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-batimat-2026-paris-stand-h1-a030.webp\" alt=\"GS Housing at BATIMAT 2026 Paris Stand H1-A030\" width=\"1448\" height=\"1086\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%271448%27%20height%3D%271086%27%20viewBox%3D%270%200%201448%201086%27%3E%3Crect%20width%3D%271448%27%20height%3D%271086%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-batimat-2026-paris-stand-h1-a030-16x12.webp 16w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-batimat-2026-paris-stand-h1-a030-200x150.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-batimat-2026-paris-stand-h1-a030-300x225.webp 300w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-batimat-2026-paris-stand-h1-a030-400x300.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-batimat-2026-paris-stand-h1-a030-600x450.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-batimat-2026-paris-stand-h1-a030-768x576.webp 768w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-batimat-2026-paris-stand-h1-a030-800x600.webp 800w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-batimat-2026-paris-stand-h1-a030-1024x768.webp 1024w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-batimat-2026-paris-stand-h1-a030-1200x900.webp 1200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-batimat-2026-paris-stand-h1-a030.webp 1448w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 1448px) 100vw, 1448px\" \/><\/p>\n<h2>From Product Selection to Project Planning<\/h2>\n<p>At the exhibition, conversations with visitors often begin with a simple product question, but quickly move into broader project planning. A contractor may need temporary offices and worker accommodation before the main project reaches full activity. A developer may need support buildings during early site preparation. A distributor may want to understand which modular products are easier to promote, install, maintain, and supply in the local market.<\/p>\n<p>These needs are different, but they all require more than choosing a standard unit. Project teams need to consider site layout, building functions, expected occupancy, access roads, lifting conditions, utility connections, delivery timing, and installation responsibilities before the final configuration is confirmed.<\/p>\n<p>This is why GS Housing is using BATIMAT 2026 to help visitors review modular buildings as part of a complete project system, rather than as isolated houses.<\/p>\n<p><img decoding=\"async\" class=\"lazyload alignnone size-full wp-image-12449\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-discussing-modular-projects-at-batimat-2026.webp\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-discussing-modular-projects-at-batimat-2026.webp\" alt=\"GS Housing discussing modular building projects with visitors at BATIMAT 2026\" width=\"1448\" height=\"1086\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%271448%27%20height%3D%271086%27%20viewBox%3D%270%200%201448%201086%27%3E%3Crect%20width%3D%271448%27%20height%3D%271086%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-discussing-modular-projects-at-batimat-2026-16x12.webp 16w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-discussing-modular-projects-at-batimat-2026-200x150.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-discussing-modular-projects-at-batimat-2026-300x225.webp 300w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-discussing-modular-projects-at-batimat-2026-400x300.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-discussing-modular-projects-at-batimat-2026-600x450.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-discussing-modular-projects-at-batimat-2026-768x576.webp 768w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-discussing-modular-projects-at-batimat-2026-800x600.webp 800w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-discussing-modular-projects-at-batimat-2026-1024x768.webp 1024w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-discussing-modular-projects-at-batimat-2026-1200x900.webp 1200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/gs-housing-discussing-modular-projects-at-batimat-2026.webp 1448w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 1448px) 100vw, 1448px\" \/><\/p>\n<h2>Modular Buildings for Construction Sites and Support Facilities<\/h2>\n<p>Construction sites and project camps usually require several types of buildings at the same time. A site may need offices, meeting rooms, accommodation blocks, dining areas, kitchens, toilets, showers, storage rooms, security rooms, and management spaces. If these functions are planned separately, later changes may affect transportation, installation, utilities, and daily operation.<\/p>\n<p>GS Housing modular building solutions can be configured for different site functions and combined according to the project layout. <a href=\"https:\/\/gshousing.com\/pt\/multi-functional-flat-pack-container-houses\/\"><b>Flat-pack container houses<\/b><\/a> can support repeated room types and phased project delivery, while <a href=\"https:\/\/gshousing.com\/pt\/expandable-container-house-models\/\"><b>expandable container house<\/b>s<\/a> can provide larger usable space from a compact transport form. For larger camps, modular buildings can also be planned as a complete accommodation and support system.<\/p>\n<p>For project buyers, the value is not only faster installation. The more important point is whether the building solution can match the actual project schedule, workforce plan, site restrictions, and future adjustment needs.<\/p>\n<p><img decoding=\"async\" class=\"lazyload alignnone size-full wp-image-12451\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/modular-building-solutions-for-construction-sites.webp\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/modular-building-solutions-for-construction-sites.webp\" alt=\"Modular building solutions for construction sites and project camps\" width=\"1448\" height=\"1086\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%271448%27%20height%3D%271086%27%20viewBox%3D%270%200%201448%201086%27%3E%3Crect%20width%3D%271448%27%20height%3D%271086%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/modular-building-solutions-for-construction-sites-16x12.webp 16w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/modular-building-solutions-for-construction-sites-200x150.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/modular-building-solutions-for-construction-sites-300x225.webp 300w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/modular-building-solutions-for-construction-sites-400x300.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/modular-building-solutions-for-construction-sites-600x450.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/modular-building-solutions-for-construction-sites-768x576.webp 768w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/modular-building-solutions-for-construction-sites-800x600.webp 800w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/modular-building-solutions-for-construction-sites-1024x768.webp 1024w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/modular-building-solutions-for-construction-sites-1200x900.webp 1200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/modular-building-solutions-for-construction-sites.webp 1448w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 1448px) 100vw, 1448px\" \/><\/p>\n<h2>Discussing European Project Requirements at the Stand<\/h2>\n<p>At BATIMAT 2026, many discussions are connected to the practical requirements of European and international projects. Visitors are asking about building functions, layout flexibility, documentation, delivery planning, installation support, and how modular buildings can adapt to different project environments.<\/p>\n<p>For GS Housing, these conversations are important because modular construction depends on early coordination. Before production begins, project teams should define the room schedule, utility interfaces, transport route, foundation conditions, lifting method, and installation sequence. If these details are confirmed too late, changes may affect both factory production and site work.<\/p>\n<p>By discussing these points face to face at the exhibition, visitors can better understand which modular solution fits their project, what information should be prepared before quotation, and how to reduce unnecessary revisions before procurement moves forward.<\/p>\n<h2>Connecting Factory Production with Site Delivery<\/h2>\n<p>A modular building project does not end when the units leave the factory. Successful delivery also depends on packing, transportation, unloading, foundation readiness, utility connection, installation guidance, and handover checks.<\/p>\n<p>GS Housing supports modular project applications through factory production and project coordination. For projects involving several building functions or phased delivery, early planning helps ensure that accommodation, offices, sanitary units, dining areas, storage spaces, and other support buildings are delivered and installed in a more organized sequence.<\/p>\n<p>This approach is especially useful for construction sites, workforce camps, remote project locations, and temporary facilities where space, time, and site access are limited.<\/p>\n<h2>Meet GS Housing at BATIMAT 2026<\/h2>\n<p>BATIMAT 2026 is still in progress, and visitors are welcome to meet GS Housing at <strong>Stand H1-A030<\/strong> to discuss modular building solutions for construction sites, <a href=\"https:\/\/gshousing.com\/pt\/projects\/\"><b>project camps<\/b><\/a>, <a href=\"https:\/\/gshousing.com\/pt\/modular-house\/\"><b>workforce accommodation<\/b><\/a>, sanitary facilities, and other project support buildings.<\/p>\n<p><img decoding=\"async\" class=\"lazyload alignnone size-full wp-image-12452\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/meet-gs-housing-at-batimat-2026-paris.webp\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/meet-gs-housing-at-batimat-2026-paris.webp\" alt=\"Meet GS Housing at BATIMAT 2026 Paris\" width=\"1448\" height=\"1086\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%271448%27%20height%3D%271086%27%20viewBox%3D%270%200%201448%201086%27%3E%3Crect%20width%3D%271448%27%20height%3D%271086%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/meet-gs-housing-at-batimat-2026-paris-16x12.webp 16w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/meet-gs-housing-at-batimat-2026-paris-200x150.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/meet-gs-housing-at-batimat-2026-paris-300x225.webp 300w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/meet-gs-housing-at-batimat-2026-paris-400x300.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/meet-gs-housing-at-batimat-2026-paris-600x450.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/meet-gs-housing-at-batimat-2026-paris-768x576.webp 768w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/meet-gs-housing-at-batimat-2026-paris-800x600.webp 800w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/meet-gs-housing-at-batimat-2026-paris-1024x768.webp 1024w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/meet-gs-housing-at-batimat-2026-paris-1200x900.webp 1200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/meet-gs-housing-at-batimat-2026-paris.webp 1448w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 1448px) 100vw, 1448px\" \/><\/p>\n<p><strong>Exposi\u00e7\u00e3o:<\/strong> BATIMAT 2026<br \/>\n<strong>Data:<\/strong> September 28 \u2013 October 1, 2026<br \/>\n<strong>Local:<\/strong> Paris Expo Porte de Versailles<br \/>\n<strong>Morada:<\/strong> 1, Place de la Porte de Versailles, 75015 Paris, Fran\u00e7a<br \/>\n<strong>Estande:<\/strong> H1-A030<\/p>\n<p>To make the discussion more efficient, visitors can bring project drawings, room schedules, site information, delivery plans, installation conditions, and required technical documents.<\/p>\n<p>Para discuss\u00f5es sobre o projeto ou para obter mais informa\u00e7\u00f5es, contacte:<\/p>\n<p><strong>E-mail:<\/strong> <a href=\"mailto:ella@gshousingglobal.com\">ella@gshousingglobal.com<\/a><br \/>\n<strong>S\u00edtio Web:<\/strong> GS Housing official website<\/p>\n<p>GS Housing looks forward to meeting more construction professionals, contractors, developers, distributors, and procurement teams in Paris, and supporting future modular building projects with practical, project-ready solutions.<\/p>\n<\/div><\/div><\/div><\/div><\/div><div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-2 fusion-flex-container nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-sizes-top:1px;--awb-border-sizes-bottom:1px;--awb-border-sizes-left:1px;--awb-border-sizes-right:1px;--awb-border-color:#e3eaf2;--awb-border-radius-top-left:8px;--awb-border-radius-top-right:8px;--awb-border-radius-bottom-right:8px;--awb-border-radius-bottom-left:8px;--awb-overflow:hidden;--awb-padding-top:28px;--awb-padding-right:28px;--awb-padding-left:28px;--awb-background-color:#ffffff;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"max-width:1248px;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-1 fusion_builder_column_1_3 1_3 fusion-flex-column fusion-flex-align-self-center\" style=\"--awb-bg-size:cover;--awb-width-large:33.333333333333%;--awb-margin-top-large:0px;--awb-spacing-right-large:5.76%;--awb-margin-bottom-large:20px;--awb-spacing-left-large:5.76%;--awb-width-medium:33.333333333333%;--awb-order-medium:0;--awb-spacing-right-medium:5.76%;--awb-spacing-left-medium:5.76%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-image-element\" style=\"text-align:center;--awb-max-width:160px;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);\"><span class=\"fusion-imageframe imageframe-none imageframe-1 hover-type-none\"><img decoding=\"async\" width=\"1200\" height=\"1200\" alt=\"GS Housing Editorial Team\" title=\"Equipa Editorial da GS Housing\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/GS-Housing-Editorial-Team.webp\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/GS-Housing-Editorial-Team-1200x1200.webp\" class=\"lazyload img-responsive wp-image-11399\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%271254%27%20height%3D%271254%27%20viewBox%3D%270%200%201254%201254%27%3E%3Crect%20width%3D%271254%27%20height%3D%271254%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/GS-Housing-Editorial-Team-200x200.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/GS-Housing-Editorial-Team-400x400.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/GS-Housing-Editorial-Team-600x600.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/GS-Housing-Editorial-Team-800x800.webp 800w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/GS-Housing-Editorial-Team-1200x1200.webp 1200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/GS-Housing-Editorial-Team.webp 1254w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 640px) 100vw, 400px\" \/><\/span><\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-2 fusion_builder_column_2_3 2_3 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:66.666666666667%;--awb-margin-top-large:0px;--awb-spacing-right-large:2.88%;--awb-margin-bottom-large:20px;--awb-spacing-left-large:2.88%;--awb-width-medium:66.666666666667%;--awb-order-medium:0;--awb-spacing-right-medium:2.88%;--awb-spacing-left-medium:2.88%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-title title fusion-title-1 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-text-color:#555555;--awb-margin-top-small:10px;--awb-margin-right-small:0px;--awb-margin-bottom-small:10px;--awb-margin-left-small:0px;--awb-font-size:16px;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;font-size:1em;\">SOBRE O AUTOR<\/h2><\/div><div class=\"fusion-text fusion-text-2\" style=\"--awb-font-size:24px;--awb-text-color:#151515;--awb-margin-top:-20px;\"><p>Equipa Editorial da GS Housing<\/p>\n<\/div><div class=\"fusion-text fusion-text-3\" style=\"--awb-font-size:16px;--awb-text-color:#333333;--awb-margin-top:-20px;\"><p>Equipa Editorial Oficial<\/p>\n<\/div><div class=\"fusion-text fusion-text-4 fusion-text-no-margin\" style=\"--awb-font-size:15px;--awb-text-color:#555555;--awb-margin-top:-18px;--awb-margin-bottom:-3px;\"><p>Atualiza\u00e7\u00f5es oficiais e informa\u00e7\u00f5es pr\u00e1ticas sobre not\u00edcias da empresa, projetos e desenvolvimentos no setor.<\/p>\n<\/div><div style=\"text-align:left;\"><a class=\"fusion-button button-flat fusion-button-default-size button-custom fusion-button-default button-1 fusion-button-default-span fusion-button-default-type\" style=\"--awb-margin-top:-1px;--awb-margin-left:-29px;--button_accent_color:#1597d4;--button_border_color:#1597d4;--button_accent_hover_color:var(--awb-color1);--button_border_hover_color:var(--awb-color1);--button_gradient_top_color:#ffffff;--button_gradient_bottom_color:#ffffff;--button_gradient_top_color_hover:hsla(var(--awb-color5-h),calc(var(--awb-color5-s) - 5%),calc(var(--awb-color5-l) - 10%),var(--awb-color5-a));--button_gradient_bottom_color_hover:hsla(var(--awb-color5-h),calc(var(--awb-color5-s) - 5%),calc(var(--awb-color5-l) - 10%),var(--awb-color5-a));--button_font_size:12px;\" target=\"_self\" href=\"https:\/\/gshousing.com\/pt\/authors\/gs-housing-editorial-team\/\" data-toggle=\"modal\" data-target=\".fusion-modal.0\"><span class=\"fusion-button-text awb-button__text awb-button__text--default\">Ver perfil do autor \u2192<\/span><\/a><\/div><\/div><\/div><\/div><\/div><\/p>","protected":false},"excerpt":{"rendered":"<p>A GS Housing est\u00e1 atualmente a participar na BATIMAT 2026, em Paris, no stand H1-A030, onde a equipa est\u00e1 a apresentar solu\u00e7\u00f5es de constru\u00e7\u00e3o modular prontas a implementar para estaleiros de constru\u00e7\u00e3o, acampamentos de obra, alojamento para trabalhadores, instala\u00e7\u00f5es sanit\u00e1rias e outros edif\u00edcios de apoio aos estaleiros.<\/p>","protected":false},"author":15,"featured_media":12449,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[37],"tags":[348],"class_list":["post-12445","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company-news","tag-gs-housing-editorial-team"],"_links":{"self":[{"href":"https:\/\/gshousing.com\/pt\/wp-json\/wp\/v2\/posts\/12445","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gshousing.com\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gshousing.com\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gshousing.com\/pt\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/gshousing.com\/pt\/wp-json\/wp\/v2\/comments?post=12445"}],"version-history":[{"count":3,"href":"https:\/\/gshousing.com\/pt\/wp-json\/wp\/v2\/posts\/12445\/revisions"}],"predecessor-version":[{"id":12455,"href":"https:\/\/gshousing.com\/pt\/wp-json\/wp\/v2\/posts\/12445\/revisions\/12455"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gshousing.com\/pt\/wp-json\/wp\/v2\/media\/12449"}],"wp:attachment":[{"href":"https:\/\/gshousing.com\/pt\/wp-json\/wp\/v2\/media?parent=12445"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gshousing.com\/pt\/wp-json\/wp\/v2\/categories?post=12445"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gshousing.com\/pt\/wp-json\/wp\/v2\/tags?post=12445"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}