{"id":10667,"date":"2026-08-12T04:37:26","date_gmt":"2026-08-12T04:37:26","guid":{"rendered":"https:\/\/gshousing.com\/?p=10667"},"modified":"2026-08-12T05:00:23","modified_gmt":"2026-08-12T05:00:23","slug":"2025-sucun-modular-portable-toilet-project","status":"publish","type":"post","link":"https:\/\/gshousing.com\/nl\/2025-sucun-modular-portable-toilet-project\/","title":{"rendered":"Project voor modulaire mobiele toiletten in de gemeenschap van Sucun (2025): versnelde inzet van een permanente sanitaire voorziening"},"content":{"rendered":"<p>In 2025, GS Housing supplied four <a href=\"https:\/\/gshousing.com\/nl\/multi-functional-flat-pack-container-houses\/\"><strong><b>standaard modulaire eenheden<\/b><\/strong><\/a>\u00a0for the Sucun Community Public Toilet Project.The modules were prefabricated in the factory, transported to the site and positioned with a crane before the remaining assembly, utility connections and finishing work were completed.<\/p>\n<p>The result is a modular portable toilet system deployed as a permanent community sanitation facility \u2014 not a short-term temporary unit. The project shows how factory-built modules can shorten the amount of major structural work required at the site while still delivering a fully functional public facility.<\/p>\n<p><img decoding=\"async\" class=\"lazyload  wp-image-10668 aligncenter\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Completed-2025-Sucun-community-modular-portable-toilet-building-with-male-and-female-entrances-and-TOILET-signage-300x208.webp\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Completed-2025-Sucun-community-modular-portable-toilet-building-with-male-and-female-entrances-and-TOILET-signage-300x208.webp\" alt=\"Completed 2025 Sucun community modular portable toilet building with male and female entrances and TOILET signage\" width=\"698\" height=\"484\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27698%27%20height%3D%27484%27%20viewBox%3D%270%200%20698%20484%27%3E%3Crect%20width%3D%27698%27%20height%3D%27484%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Completed-2025-Sucun-community-modular-portable-toilet-building-with-male-and-female-entrances-and-TOILET-signage-18x12.webp 18w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Completed-2025-Sucun-community-modular-portable-toilet-building-with-male-and-female-entrances-and-TOILET-signage-200x138.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Completed-2025-Sucun-community-modular-portable-toilet-building-with-male-and-female-entrances-and-TOILET-signage-300x208.webp 300w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Completed-2025-Sucun-community-modular-portable-toilet-building-with-male-and-female-entrances-and-TOILET-signage-400x277.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Completed-2025-Sucun-community-modular-portable-toilet-building-with-male-and-female-entrances-and-TOILET-signage-600x415.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Completed-2025-Sucun-community-modular-portable-toilet-building-with-male-and-female-entrances-and-TOILET-signage.webp 692w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 698px) 100vw, 698px\" \/><\/p>\n<h2><\/h2>\n<h2><strong><b>Projectoverzicht<\/b><\/strong><\/h2>\n<table>\n<tbody>\n<tr>\n<td width=\"360\">Artikel<\/td>\n<td width=\"360\">Detail<\/td>\n<\/tr>\n<tr>\n<td width=\"360\">Projectjaar<\/td>\n<td width=\"360\">2025<\/td>\n<\/tr>\n<tr>\n<td width=\"360\">Naam van het project<\/td>\n<td width=\"360\">Sucun Community Public Toilet<\/td>\n<\/tr>\n<tr>\n<td width=\"360\">Locatie<\/td>\n<td width=\"360\">Sucun<\/td>\n<\/tr>\n<tr>\n<td width=\"360\">Modulaire eenheden<\/td>\n<td width=\"360\">4<\/td>\n<\/tr>\n<tr>\n<td width=\"360\">Toepassing<\/td>\n<td width=\"360\">Community public sanitation facility<\/td>\n<\/tr>\n<tr>\n<td width=\"360\">Installation Method<\/td>\n<td width=\"360\">Crane-assisted positioning + on-site finishing<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><\/h2>\n<h2><strong><b>Why Modular Construction Was Chosen<\/b><\/strong><\/h2>\n<p>Community public toilet projects are usually small in scale, but they still face many of the same construction challenges as larger buildings: limited site space, nearby residents, material storage, labor availability and the need to keep disruption under control.<\/p>\n<p><img decoding=\"async\" class=\"lazyload  wp-image-10669 aligncenter\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Four-modular-toilet-units-delivered-to-Sucun-project-site-on-flatbed-truck-with-crane-onsite-300x186.webp\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Four-modular-toilet-units-delivered-to-Sucun-project-site-on-flatbed-truck-with-crane-onsite-300x186.webp\" alt=\"Four modular toilet units delivered to Sucun project site on flatbed truck with crane onsite\" width=\"690\" height=\"428\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27690%27%20height%3D%27428%27%20viewBox%3D%270%200%20690%20428%27%3E%3Crect%20width%3D%27690%27%20height%3D%27428%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Four-modular-toilet-units-delivered-to-Sucun-project-site-on-flatbed-truck-with-crane-onsite-18x12.webp 18w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Four-modular-toilet-units-delivered-to-Sucun-project-site-on-flatbed-truck-with-crane-onsite-200x124.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Four-modular-toilet-units-delivered-to-Sucun-project-site-on-flatbed-truck-with-crane-onsite-300x186.webp 300w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Four-modular-toilet-units-delivered-to-Sucun-project-site-on-flatbed-truck-with-crane-onsite-400x248.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Four-modular-toilet-units-delivered-to-Sucun-project-site-on-flatbed-truck-with-crane-onsite-600x372.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Four-modular-toilet-units-delivered-to-Sucun-project-site-on-flatbed-truck-with-crane-onsite.webp 692w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 690px) 100vw, 690px\" \/><\/p>\n<p>The Sucun project addressed these constraints by shifting a significant portion of the building process off site. The four modular toilet units were produced in the factory before transportation, with major structural components, internal partitions and utility rough-ins prepared in advance under controlled factory conditions.<\/p>\n<p>Instead of building the facility from scratch on site, the project moved from foundation preparation directly to module positioning, connection and finishing.<\/p>\n<p>For smaller public infrastructure projects, that shift makes the construction process easier to coordinate and substantially reduces the amount of major structural work taking place directly on site.<\/p>\n<h2><\/h2>\n<h2><strong><b>Fast-Track Deployment: From Factory to Completed Facility<\/b><\/strong><\/h2>\n<p>The Sucun project followed a straightforward modular construction sequence designed to compress the on-site construction window.<\/p>\n<h3><strong><b>1. Factory Prefabrication<\/b><\/strong><\/h3>\n<p>The four toilet modules were manufactured before delivery, including the main structural work, internal partitioning and utility rough-ins. Preparing these components in advance keeps the building process more consistent and reduces the amount of basic fabrication required after delivery.<\/p>\n<p><img decoding=\"async\" class=\"lazyload  wp-image-10670 aligncenter\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Factory-prefabricated-modular-toilet-units-being-loaded-and-secured-onto-transport-truck-300x207.webp\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Factory-prefabricated-modular-toilet-units-being-loaded-and-secured-onto-transport-truck-300x207.webp\" alt=\"Factory-prefabricated modular toilet units being loaded and secured onto transport truck \" width=\"650\" height=\"448\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27650%27%20height%3D%27448%27%20viewBox%3D%270%200%20650%20448%27%3E%3Crect%20width%3D%27650%27%20height%3D%27448%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Factory-prefabricated-modular-toilet-units-being-loaded-and-secured-onto-transport-truck-18x12.webp 18w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Factory-prefabricated-modular-toilet-units-being-loaded-and-secured-onto-transport-truck-200x138.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Factory-prefabricated-modular-toilet-units-being-loaded-and-secured-onto-transport-truck-300x207.webp 300w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Factory-prefabricated-modular-toilet-units-being-loaded-and-secured-onto-transport-truck-400x276.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Factory-prefabricated-modular-toilet-units-being-loaded-and-secured-onto-transport-truck-600x414.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Factory-prefabricated-modular-toilet-units-being-loaded-and-secured-onto-transport-truck.webp 692w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 650px) 100vw, 650px\" \/><\/p>\n<p>Crucially, factory production and site preparation can run in parallel \u2014 foundation work at the site can progress while the modules are still being manufactured, rather than waiting for one phase to finish before the next can begin.<\/p>\n<h3><strong><b>2. Transportation and Crane Positioning<\/b><\/strong><\/h3>\n<p>Once the site was ready, the completed modules were transported to Sucun and lifted into position using a crane. This approach avoids the need to construct the main building structure from raw materials at the destination.<\/p>\n<p>Because the main structural placement is concentrated into a short lifting and positioning phase \u2014 rather than spread across an extended period of conventional framing \u2014 the on-site construction window is significantly shorter than that of a traditional masonry or concrete toilet building. The crane operation is also particularly useful where the available construction area is limited.<\/p>\n<p><img decoding=\"async\" class=\"lazyload  wp-image-10671 aligncenter\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Crane-lifting-a-modular-toilet-unit-into-foundation-position-at-Sucun-project-site-243x300.webp\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Crane-lifting-a-modular-toilet-unit-into-foundation-position-at-Sucun-project-site-243x300.webp\" alt=\"Crane lifting a modular toilet unit into foundation position at Sucun project site\" width=\"454\" height=\"560\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27454%27%20height%3D%27560%27%20viewBox%3D%270%200%20454%20560%27%3E%3Crect%20width%3D%27454%27%20height%3D%27560%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Crane-lifting-a-modular-toilet-unit-into-foundation-position-at-Sucun-project-site-10x12.webp 10w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Crane-lifting-a-modular-toilet-unit-into-foundation-position-at-Sucun-project-site-200x247.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Crane-lifting-a-modular-toilet-unit-into-foundation-position-at-Sucun-project-site-243x300.webp 243w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Crane-lifting-a-modular-toilet-unit-into-foundation-position-at-Sucun-project-site.webp 388w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 454px) 100vw, 454px\" \/><\/p>\n<h3><strong><b>3. Assembly and Utility Connections<\/b><\/strong><\/h3>\n<p>After the modules were positioned, the site team completed the necessary connections between the units. Because the main utility rough-ins had already been prepared in the factory, the remaining work focused on connecting the systems at the site and completing the required installation work.<\/p>\n<p>Plumbing and electrical connections were integrated into the finished facility as part of the final site installation.<\/p>\n<h3><strong><b>4. Exterior Finishing and Site Integration<\/b><\/strong><\/h3>\n<p>The final stage involved completing the exterior appearance and surrounding site works. Although the modules are manufactured off site, the finished building can still be designed and finished to suit the surrounding community. With appropriate exterior finishing, landscaping and surrounding works, the completed facility can fit into an existing community environment naturally.<\/p>\n<p><img decoding=\"async\" class=\"lazyload  wp-image-10672 aligncenter\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Sucun-modular-public-toilet-under-exterior-finishing-and-site-integration-works-300x210.webp\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Sucun-modular-public-toilet-under-exterior-finishing-and-site-integration-works-300x210.webp\" alt=\"Sucun modular public toilet under exterior finishing and site integration works\" width=\"577\" height=\"404\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27577%27%20height%3D%27404%27%20viewBox%3D%270%200%20577%20404%27%3E%3Crect%20width%3D%27577%27%20height%3D%27404%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Sucun-modular-public-toilet-under-exterior-finishing-and-site-integration-works-18x12.webp 18w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Sucun-modular-public-toilet-under-exterior-finishing-and-site-integration-works-200x140.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Sucun-modular-public-toilet-under-exterior-finishing-and-site-integration-works-300x210.webp 300w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Sucun-modular-public-toilet-under-exterior-finishing-and-site-integration-works-400x280.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Sucun-modular-public-toilet-under-exterior-finishing-and-site-integration-works-600x420.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/08\/Sucun-modular-public-toilet-under-exterior-finishing-and-site-integration-works.webp 684w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 577px) 100vw, 577px\" \/><\/p>\n<p>The exact total schedule depends on factors such as foundation preparation, site access, crane arrangements, utility connections and finishing requirements. The core benefit of the modular approach is that a substantial part of the building work is completed before the modules ever reach the site.<\/p>\n<h2><\/h2>\n<h2><strong><b>How Modular Construction Compares with Traditional Site-Built Toilets<\/b><\/strong><\/h2>\n<table>\n<tbody>\n<tr>\n<td width=\"240\">Aspect<\/td>\n<td width=\"240\">Traditional Construction<\/td>\n<td width=\"240\">Modular Construction (Sucun Approach)<\/td>\n<\/tr>\n<tr>\n<td width=\"240\">On-site structural work<\/td>\n<td width=\"240\">Extended framing, masonry and installation<\/td>\n<td width=\"240\">Main structure factory-built; site work focused on positioning and connections<\/td>\n<\/tr>\n<tr>\n<td width=\"240\">Material storage<\/td>\n<td width=\"240\">Large area required for multiple materials<\/td>\n<td width=\"240\">Minimal; modules arrive ready for installation<\/td>\n<\/tr>\n<tr>\n<td width=\"240\">Weather disruption<\/td>\n<td width=\"240\">High; rain or extreme heat can delay work<\/td>\n<td width=\"240\">Low; most work completed indoors<\/td>\n<\/tr>\n<tr>\n<td width=\"240\">Site disruption<\/td>\n<td width=\"240\">Extended \u2014 noise, dust and traffic throughout construction<\/td>\n<td width=\"240\">Compressed \u2014 concentrated into a shorter installation period<\/td>\n<\/tr>\n<tr>\n<td width=\"240\">Total on-site construction time<\/td>\n<td width=\"240\">Multiple weeks<\/td>\n<td width=\"240\">Significantly reduced compared with conventional timelines<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><\/h2>\n<h2><strong><b>Beyond Modular Temporary Toilets: A Permanent Community Facility<\/b><\/strong><\/h2>\n<p>The Sucun project is particularly relevant because it was not developed as a short-term construction-site toilet or event facility. The four modules were used to create a community public toilet designed for ongoing public use.<\/p>\n<p>This distinction matters when comparing modular public toilets with simple portable sanitation products. A basic portable toilet is generally designed around mobility and short-term use. A modular portable toilet building, by contrast, can provide a more complete enclosed structure with defined internal spaces, building services, finishes and a site-specific exterior design.<\/p>\n<p>The term &#8220;<a href=\"https:\/\/gshousing.com\/nl\/sanitary-container-europe\/\"><strong><b>modular temporary toilets<\/b><\/strong><\/a>&#8221; is often associated with worker camps, construction sites and events. The Sucun project shows another application: a factory-built modular system can also be finished as a long-term community sanitation facility.<\/p>\n<h2><\/h2>\n<h2><strong><b>Why Modular Public Toilets Make Sense for Community Projects<\/b><\/strong><\/h2>\n<h3><strong><b>Reduced On-Site Structural Work<\/b><\/strong><\/h3>\n<p>The major structural components and building elements are prepared in the factory, leaving the destination site mainly responsible for positioning, connections, finishing and related site works. For community projects with restricted working areas, this makes material handling and construction management easier.<\/p>\n<h3><strong><b>Less Dependence on Extensive Site Fabrication<\/b><\/strong><\/h3>\n<p>With modular construction, much of the work that would normally happen at the destination \u2014 structural framing, wall construction, interior installation \u2014 is transferred to the factory. This does not eliminate site work, but it changes the nature of that work: instead of building the entire facility from scratch, the project team works with completed modules and focuses on integrating them into the prepared site.<\/p>\n<h3><strong><b>Suitable for Different Public Applications<\/b><\/strong><\/h3>\n<p>The same modular building concept can be adapted to different public sanitation requirements:<\/p>\n<ul>\n<li>Community public toilets<\/li>\n<li>Park sanitation facilities<\/li>\n<li>Tourist-area toilets<\/li>\n<li>Public-space facilities<\/li>\n<li>Small infrastructure projects<\/li>\n<li>Temporary-to-long-term public facilities<\/li>\n<\/ul>\n<p>The internal layout, sanitary equipment, exterior finishes and supporting site works can be adjusted according to the application and local requirements.<\/p>\n<h2><\/h2>\n<h2><strong><b>Projectresultaat<\/b><\/strong><\/h2>\n<p>The 2025 Sucun Community Public Toilet Project used four modular units to deliver a completed public sanitation facility through a streamlined workflow:<\/p>\n<p><strong>Factory production \u2192 Transportation \u2192 Crane positioning \u2192 Module connection \u2192 Utility connection \u2192 Finishing<\/strong><\/p>\n<p>This approach allows the main building components to be prepared in advance while leaving the final installation and appearance to be completed around the actual site conditions.<\/p>\n<p>For community projects where construction space, labor, material handling and site disruption are important considerations, modular public toilet buildings provide a practical alternative to conventional site-built construction. More importantly, the completed Sucun facility shows that a modular toilet building does not have to look or function like a basic temporary unit. With appropriate planning and finishing, factory-produced modules can become part of a long-term community facility.<\/p>\n<h2><\/h2>\n<h2><strong><b>Veelgestelde vragen<\/b><\/strong><\/h2>\n<h3><strong>What is a modular public toilet?<\/strong><\/h3>\n<p>A modular public toilet is a prefabricated sanitation building produced partly or largely in a factory and then transported to the project site for installation. Unlike a simple portable toilet, it can incorporate a complete building structure, internal spaces, utilities, finishes and site-specific exterior design.<\/p>\n<h3><strong>How many modules were used in the Sucun project?<\/strong><\/h3>\n<p>The Sucun Community Public Toilet Project used four modular units supplied by GS Housing.<\/p>\n<h3><strong>Was the Sucun public toilet built for temporary use?<\/strong><\/h3>\n<p>No. The completed project is a community public toilet intended for ongoing public use. It demonstrates that modular construction can be applied to community infrastructure rather than being limited to construction sites or temporary accommodation.<\/p>\n<h3><strong>How were the modular toilet units installed?<\/strong><\/h3>\n<p>The units were manufactured and prepared in the factory before being transported to Sucun. A crane was then used to position the modules on the prepared foundation. The remaining work included module connections, utility connections, finishing and surrounding site work.<\/p>\n<h3><strong>Were the plumbing and electrical systems prepared in the factory?<\/strong><\/h3>\n<p>Yes. The project used factory-prepared utility rough-ins, which reduced the amount of basic plumbing and electrical preparation required after the modules arrived on site. Final connections were completed during site installation.<\/p>\n<h3><strong>How does the deployment speed compare with conventional construction?<\/strong><\/h3>\n<p>Because the main structural components are produced before delivery, the on-site construction phase is substantially reduced compared with conventional masonry or concrete construction. Crane positioning and module installation can be completed within a concentrated work window, while the total schedule still depends on foundation preparation, utility connections, finishing requirements and local site conditions.<\/p>\n<h3><strong>Can modular public toilets be used in other communities or public spaces?<\/strong><\/h3>\n<p>Yes. The modular approach can be adapted for community facilities, parks, tourist areas and other public sanitation projects. The structural system, sanitary layout, utilities, accessibility provisions and other details should be designed according to the requirements of each location.<\/p>\n<h3><strong>What is the difference between a modular public toilet and a portable toilet?<\/strong><\/h3>\n<p>A portable toilet is generally a compact movable sanitation unit intended for temporary or flexible use. A modular public toilet is a prefabricated building system that can provide enclosed rooms, integrated utilities, building finishes and a more permanent architectural solution.<\/p>\n<h2><\/h2>\n<h2><strong><b>Looking for a Modular Public Toilet Solution?<\/b><\/strong><\/h2>\n<p>Whether the project is a community public toilet, park facility, tourist-area sanitation building or another small public infrastructure project, modular construction can provide a practical alternative to fully site-built construction \u2014 with faster on-site deployment and reduced structural work at the destination.<\/p>\n<p>GS Housing can develop modular configurations according to the required layout, site conditions, utility requirements and intended use.<\/p>\n<p><a href=\"https:\/\/gshousing.com\/nl\/contact\/\"><strong><b>Neem contact op met GS Housing \u00a0<\/b><\/strong><\/a>to discuss your project requirements and available modular portable toilet configurations.<\/p>","protected":false},"excerpt":{"rendered":"<p>GS Housing supplied four standard modular units for the 2025 Sucun Community Public Toilet Project, demonstrating how fast-track modular construction can deliver a permanent community sanitation facility rather than a temporary solution.<\/p>","protected":false},"author":7,"featured_media":10668,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[39],"tags":[41,342],"class_list":["post-10667","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-case","tag-flat-pack-container-house","tag-public-facilities"],"_links":{"self":[{"href":"https:\/\/gshousing.com\/nl\/wp-json\/wp\/v2\/posts\/10667","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gshousing.com\/nl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gshousing.com\/nl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gshousing.com\/nl\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/gshousing.com\/nl\/wp-json\/wp\/v2\/comments?post=10667"}],"version-history":[{"count":3,"href":"https:\/\/gshousing.com\/nl\/wp-json\/wp\/v2\/posts\/10667\/revisions"}],"predecessor-version":[{"id":10675,"href":"https:\/\/gshousing.com\/nl\/wp-json\/wp\/v2\/posts\/10667\/revisions\/10675"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gshousing.com\/nl\/wp-json\/wp\/v2\/media\/10668"}],"wp:attachment":[{"href":"https:\/\/gshousing.com\/nl\/wp-json\/wp\/v2\/media?parent=10667"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gshousing.com\/nl\/wp-json\/wp\/v2\/categories?post=10667"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gshousing.com\/nl\/wp-json\/wp\/v2\/tags?post=10667"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}