{"id":8551,"date":"2022-04-02T10:17:08","date_gmt":"2022-04-02T10:17:08","guid":{"rendered":"https:\/\/gshousing.com\/?p=8551"},"modified":"2026-07-03T03:20:49","modified_gmt":"2026-07-03T03:20:49","slug":"modular-hospital-in-jilin-430000-m%c2%b2-makeshift-hospital-built-with-flat-packed-container-houses","status":"publish","type":"post","link":"https:\/\/gshousing.com\/el\/modular-hospital-in-jilin-430000-m%c2%b2-makeshift-hospital-built-with-flat-packed-container-houses\/","title":{"rendered":"Modular Hospital In Jilin  | 430,000 m\u00b2 Makeshift Hospital Built with Flat Packed Container Houses"},"content":{"rendered":"<div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 fusion-flex-container has-pattern-background has-mask-background nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"max-width:1248px;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:20px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-title title fusion-title-1 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-font-size:2em;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;font-size:1em;\"><h2><strong><b>Project Overview<\/b><\/strong><\/h2><\/h2><\/div><div class=\"fusion-text fusion-text-1\"><p><strong>Project Name:<\/strong>\u00a0Jilin High-tech South District Makeshift Hospital<br \/>\n<strong>Location:<\/strong>\u00a0Jilin, China<br \/>\n<strong>Construction Start:<\/strong>\u00a0March 14<br \/>\n<strong>Site Leveling:<\/strong>\u00a0Started on the afternoon of March 12 and completed after 36 hours<br \/>\n<strong>Installation Duration:<\/strong>\u00a05 days for flat packed container house installation<br \/>\n<strong><a href=\"https:\/\/gshousing.com\/el\/products\/\">Building Type<\/a>:<\/strong>\u00a0Flat Packed Container House \/ Modular Makeshift Hospital \/ Prefabricated Container House<br \/>\n<strong>Project Area:<\/strong>\u00a0430,000 m\u00b2<br \/>\n<strong>Isolation Rooms:<\/strong>\u00a06,000 rooms after completion<br \/>\n<strong>Construction Mode:<\/strong>\u00a024-hour uninterrupted construction<br \/>\n<strong>Usage:<\/strong>\u00a0Makeshift hospital \/ COVID-19 isolation facility \/ Emergency public health response infrastructure<\/p>\n<\/div><a class=\"fusion-modal-text-link\" href=\"#\"><iframe class=\"lazyload\" title=\"YouTube video player\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27100%27%20height%3D%27450%27%20viewBox%3D%270%200%20100%20450%27%3E%3Crect%20width%3D%27100%27%20height%3D%27450%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-orig-src=\"https:\/\/www.youtube.com\/embed\/0MIdX4iPsuY\" width=\"100%\" height=\"450\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\"><br \/>\n<\/iframe><\/a><div class=\"fusion-title title fusion-title-2 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-font-size:32px;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;font-size:1em;\"><div style=\"text-align: left;\">\n<h2><strong><b>Project Background<\/b><\/strong><\/h2>\n<\/div><\/h2><\/div><div class=\"fusion-text fusion-text-2\"><p>The Jilin High-tech South District Makeshift Hospital was built as an emergency response project during the COVID-19 prevention and control period.<\/p>\n<p>The construction site faced difficult weather conditions, including heavy snow. At the same time, dozens of construction vehicles operated continuously across the site to support ground preparation, material handling, and installation work.<\/p>\n<p>On the afternoon of March 12, the construction team entered the site and began land leveling. After 36 hours of site preparation, the project moved into the flat packed container house installation stage. The installation work was completed within 5 days.<\/p>\n<\/div><div class=\"fusion-title title fusion-title-3 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-font-size:32px;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;font-size:1em;\"><div style=\"text-align: left;\">\n<h2><strong><b>Construction Process<\/b><\/strong><\/h2>\n<\/div><\/h2><\/div><div class=\"fusion-text fusion-text-3\"><h3><strong><b style=\"font-size: 20px;\" data-fusion-font=\"true\">1. 36-Hour Site Leveling<\/b><\/strong><\/h3>\n<p>Before modular installation, the construction team first carried out large-scale site leveling. This stage started on the afternoon of March 12 and was completed after 36 hours.<\/p>\n<p>The fast completion of site preparation created the basic conditions for the following modular house installation work.<\/p>\n<h3><strong><b style=\"font-size: 20px;\" data-fusion-font=\"true\">2. 5-Day Flat Packed Container House Installation<\/b><\/strong><\/h3>\n<p>After site leveling, the project entered the modular installation stage.<\/p>\n<p>Flat packed container houses were used as the main building units. The modular system allowed standard units to be transported to the site, positioned, assembled, and connected within a compressed schedule.<\/p>\n<p>The installation was completed within 5 days.<\/p>\n<h3><strong><b style=\"font-size: 20px;\" data-fusion-font=\"true\">3. 24-Hour Uninterrupted Construction<\/b><\/strong><\/h3>\n<p>To meet the emergency construction schedule, more than 5,000 professionals of different types entered the site.<\/p>\n<p>Construction was organized on a 24-hour basis, with personnel, vehicles, and equipment working continuously to support project progress.<\/p>\n<h3><strong><b style=\"font-size: 20px;\" data-fusion-font=\"true\">4. Large-Scale Site Coordination<\/b><\/strong><\/h3>\n<p>The project covered an area of 430,000 m\u00b2, requiring coordination across ground leveling, material transportation, modular house installation, equipment scheduling, and on-site traffic flow.<\/p>\n<p>Dozens of construction vehicles shuttled through the site during the construction period, supporting continuous operations in cold and snowy weather conditions.<\/p>\n<\/div><div class=\"fusion-title title fusion-title-4 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-font-size:32px;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;font-size:1em;\"><div style=\"text-align: left;\">\n<h2><strong><b>Conclusion<\/b><\/strong><\/h2>\n<\/div><\/h2><\/div><div class=\"fusion-text fusion-text-4\"><p>The Jilin High-tech South District Makeshift Hospital was a large-scale emergency modular hospital project built with flat packed container houses.<\/p>\n<p>After 36 hours of site leveling, the project completed modular house installation within 5 days. With a total area of 430,000 m\u00b2 and 6,000 isolation rooms planned after completion, the project shows how prefabricated container house systems can be used for large-scale emergency isolation facilities under compressed construction schedules.<\/p>\n<\/div><\/div><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":4,"featured_media":8546,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[39],"tags":[41,51],"class_list":["post-8551","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-case","tag-flat-pack-container-house","tag-hospital-clinic-health-center"],"_links":{"self":[{"href":"https:\/\/gshousing.com\/el\/wp-json\/wp\/v2\/posts\/8551","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gshousing.com\/el\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gshousing.com\/el\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gshousing.com\/el\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/gshousing.com\/el\/wp-json\/wp\/v2\/comments?post=8551"}],"version-history":[{"count":2,"href":"https:\/\/gshousing.com\/el\/wp-json\/wp\/v2\/posts\/8551\/revisions"}],"predecessor-version":[{"id":8553,"href":"https:\/\/gshousing.com\/el\/wp-json\/wp\/v2\/posts\/8551\/revisions\/8553"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gshousing.com\/el\/wp-json\/wp\/v2\/media\/8546"}],"wp:attachment":[{"href":"https:\/\/gshousing.com\/el\/wp-json\/wp\/v2\/media?parent=8551"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gshousing.com\/el\/wp-json\/wp\/v2\/categories?post=8551"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gshousing.com\/el\/wp-json\/wp\/v2\/tags?post=8551"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}