{"id":11567,"date":"2026-09-07T10:09:47","date_gmt":"2026-09-07T10:09:47","guid":{"rendered":"https:\/\/gshousing.com\/?p=11567"},"modified":"2026-09-07T10:09:47","modified_gmt":"2026-09-07T10:09:47","slug":"construction-site-accommodation-chile-metro","status":"publish","type":"post","link":"https:\/\/gshousing.com\/ar\/construction-site-accommodation-chile-metro\/","title":{"rendered":"Construction Site Accommodation: Chile Metro \u2014 132 Units"},"content":{"rendered":"<p><div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 fusion-flex-container nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"max-width:1248px;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-blend:overlay;--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:0px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-1\"><p>Large infrastructure projects often need to solve two practical problems at the same time: where the project team will work and where construction personnel will stay. For a metro project, these facilities also need to fit around active construction, site access and the available land. Construction site accommodation is therefore not a secondary concern\u2014it is a core part of keeping a large project team organized.<\/p>\n<p>For the Chile metro construction project, GS Housing supplied 132<strong><b>\u00a0<a href=\"https:\/\/gshousing.com\/ar\/multi-functional-flat-pack-container-houses\/\">flat pack container house<\/a><\/b><\/strong> units for a combined site office and worker accommodation facility. The units were configured into different functional areas, including two-storey office buildings for project management and engineering teams, single-storey accommodation blocks for construction personnel, and shared outdoor recreation space.<\/p>\n<p>Rather than supplying separate buildings for each function, the project used one prefabricated site accommodation system that could be arranged according to the project&#8217;s workforce and site.<\/p>\n<p><img decoding=\"async\" class=\"lazyload  wp-image-11569 aligncenter\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Two-storey-office-building-with-glass-facade-300x225.webp\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Two-storey-office-building-with-glass-facade-300x225.webp\" alt=\"Two-storey modular site office building at the Chile metro construction project, with blue-tinted upper-floor windows, a balcony, parking area and dry hills in the background\" width=\"648\" height=\"486\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27648%27%20height%3D%27486%27%20viewBox%3D%270%200%20648%20486%27%3E%3Crect%20width%3D%27648%27%20height%3D%27486%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Two-storey-office-building-with-glass-facade-16x12.webp 16w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Two-storey-office-building-with-glass-facade-200x150.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Two-storey-office-building-with-glass-facade-300x225.webp 300w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Two-storey-office-building-with-glass-facade-400x300.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Two-storey-office-building-with-glass-facade-600x450.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Two-storey-office-building-with-glass-facade-768x576.webp 768w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Two-storey-office-building-with-glass-facade-800x600.webp 800w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Two-storey-office-building-with-glass-facade-1024x768.webp 1024w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Two-storey-office-building-with-glass-facade-1200x900.webp 1200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Two-storey-office-building-with-glass-facade-1536x1152.webp 1536w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Two-storey-office-building-with-glass-facade.webp 1707w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 648px) 100vw, 648px\" \/><\/p>\n<h2><strong><b>\u0646\u0638\u0631\u0629 \u0639\u0627\u0645\u0629 \u0639\u0644\u0649 \u0627\u0644\u0645\u0634\u0631\u0648\u0639<\/b><\/strong><\/h2>\n<table style=\"height: 710px;\" width=\"836\">\n<tbody>\n<tr>\n<td width=\"360\"><strong>\u0627\u0644\u0639\u0646\u0635\u0631<\/strong><\/td>\n<td width=\"360\"><strong>\u0627\u0644\u062a\u0641\u0627\u0635\u064a\u0644<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"360\">\u0627\u0644\u0645\u0634\u0631\u0648\u0639<\/td>\n<td width=\"360\">Chile Metro Construction Project<\/td>\n<\/tr>\n<tr>\n<td width=\"360\">\u0627\u0644\u0645\u0648\u0642\u0639<\/td>\n<td width=\"360\">Chile<\/td>\n<\/tr>\n<tr>\n<td width=\"360\">\u0627\u0644\u0645\u0646\u062a\u062c<\/td>\n<td width=\"360\">Flat Pack Container House \/ Prefabricated Container House<\/td>\n<\/tr>\n<tr>\n<td width=\"360\">\u0627\u0644\u0643\u0645\u064a\u0629<\/td>\n<td width=\"360\">132 units<\/td>\n<\/tr>\n<tr>\n<td width=\"360\">\u0627\u0644\u062a\u0637\u0628\u064a\u0642<\/td>\n<td width=\"360\">Site offices and workforce accommodation<\/td>\n<\/tr>\n<tr>\n<td width=\"360\">\u0646\u0648\u0639 \u0627\u0644\u0645\u0628\u0646\u0649<\/td>\n<td width=\"360\">Modular construction camp with office and residential zones<\/td>\n<\/tr>\n<tr>\n<td width=\"360\">\u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645\u0648\u0646 \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0648\u0646<\/td>\n<td width=\"360\">Project management, engineering teams and construction personnel<\/td>\n<\/tr>\n<tr>\n<td width=\"360\">\u0627\u0644\u062a\u0631\u062a\u064a\u0628<\/td>\n<td width=\"360\">Two-storey office buildings and single-storey accommodation blocks<\/td>\n<\/tr>\n<tr>\n<td width=\"360\">\u0637\u0631\u064a\u0642\u0629 \u0627\u0644\u0628\u0646\u0627\u0621<\/td>\n<td width=\"360\">\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0645\u0633\u0628\u0642 \u0641\u064a \u0627\u0644\u0645\u0635\u0646\u0639 + \u0627\u0644\u062a\u062c\u0645\u064a\u0639 \u0641\u064a \u0627\u0644\u0645\u0648\u0642\u0639<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><strong><b>From Metro Construction Requirements to a Site Accommodation Solution<\/b><\/strong><\/h2>\n<p>A large metro project brings together people with very different day-to-day requirements. Project managers, engineers and supervisors need offices for administration, coordination and meetings. Construction personnel need accommodation close to the work area, together with basic shared facilities for daily life.<\/p>\n<p>In an urban or semi-urban project, renting scattered properties nearby is rarely practical. The team needs to be coordinated from one location, while the facilities themselves must fit within the available site area without interfering with construction activities.<\/p>\n<p>GS Housing addressed this with 132 units, creating a prefabricated site accommodation facility organized into clearly defined functional zones. A two-storey modular site office was configured for project management and engineering teams\u2014the same office-focused approach used in GS Housing&#8217;s Mali project, where 130 units formed a dedicated <a href=\"https:\/\/gshousing.com\/ar\/modular-site-office-2024-mali-project\/\"><strong><b>modular site office<\/b><\/strong> <\/a>for an overseas project team. Single-storey accommodation blocks served construction personnel, and shared outdoor space including a basketball court provided recreation for workers living on site.<\/p>\n<p>This approach meant the project did not need to source offices and accommodation separately. The same modular building system was used across the facility, while the layout and configuration were adapted to the project&#8217;s workforce and site conditions.<\/p>\n<h2><strong><b>132 Units: Combining Offices, Accommodation and Shared Facilities<\/b><\/strong><\/h2>\n<p>The Chile metro project involved 132 units configured for different functions within one coordinated construction site accommodation facility.<\/p>\n<p><img decoding=\"async\" class=\"lazyload  wp-image-11568 aligncenter\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Single-storey-accommodation-blocks-with-basketball-court-300x225.webp\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Single-storey-accommodation-blocks-with-basketball-court-300x225.webp\" alt=\"Single-storey workforce accommodation buildings at the Chile metro construction project, with a basketball court in the foreground where workers are playing, rows of doors and windows along the building, and trees in the background\" width=\"678\" height=\"508\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27678%27%20height%3D%27508%27%20viewBox%3D%270%200%20678%20508%27%3E%3Crect%20width%3D%27678%27%20height%3D%27508%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Single-storey-accommodation-blocks-with-basketball-court-16x12.webp 16w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Single-storey-accommodation-blocks-with-basketball-court-200x150.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Single-storey-accommodation-blocks-with-basketball-court-300x225.webp 300w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Single-storey-accommodation-blocks-with-basketball-court-400x300.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Single-storey-accommodation-blocks-with-basketball-court-600x450.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Single-storey-accommodation-blocks-with-basketball-court-768x576.webp 768w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Single-storey-accommodation-blocks-with-basketball-court-800x600.webp 800w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Single-storey-accommodation-blocks-with-basketball-court-1024x768.webp 1024w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Single-storey-accommodation-blocks-with-basketball-court-1200x900.webp 1200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Single-storey-accommodation-blocks-with-basketball-court-1536x1152.webp 1536w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Single-storey-accommodation-blocks-with-basketball-court.webp 1707w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 678px) 100vw, 678px\" \/><\/p>\n<p>The office buildings use a two-storey configuration with large glass windows across the upper floor, creating a professional working environment for project management and engineering teams. The accommodation blocks are single-storey structures arranged in rows, with individual access doors and windows for each unit. Between the buildings, paved outdoor space and recreation facilities support daily life for the workforce.<\/p>\n<p>The same flat pack container house system is used across both functional zones. A similar <a href=\"https:\/\/gshousing.com\/ar\/construction-site-accommodation-fht-nickel-smelting\/\"><strong><b>\u0623\u0645\u0627\u0643\u0646 \u0627\u0644\u0625\u0642\u0627\u0645\u0629 \u0641\u064a \u0645\u0648\u0627\u0642\u0639 \u0627\u0644\u0628\u0646\u0627\u0621<\/b><\/strong><\/a>\u00a0approach was used in GS Housing&#8217;s Indonesia FHT nickel smelting project, where four prefabricated buildings provided site offices and worker dormitories at a remote industrial site.<\/p>\n<p>For a metro project, this combination brings working and living facilities together within one coordinated site. The office zone supports project management and construction coordination, while the accommodation zone provides housing for the personnel carrying out the work.<\/p>\n<h2><strong><b>Factory Prefabrication and Modular Configuration for Infrastructure Projects<\/b><\/strong><\/h2>\n<p>The 132 units for the Chile metro project were factory-prefabricated before delivery. The main building components\u2014structural frames, wall panels, roofing, windows and doors\u2014were produced and inspected in the factory before being transported to the project location for assembly.<\/p>\n<p>For an infrastructure project with a defined timeline, this allows building production to progress alongside site preparation rather than waiting for all site work to finish. The units can be manufactured while foundations and access areas are being prepared. This is particularly efficient on metro and urban sites, where space for material storage and on-site fabrication is limited.<\/p>\n<p>The modular configuration also allows the facility to be adapted to different requirements. Units can be combined into larger office spaces, meeting rooms or shared facilities, while individual units can serve as private offices or accommodation rooms. If workforce requirements change during the project, additional units can also be added or existing units reconfigured, subject to the site layout and structural requirements.<\/p>\n<p>For metro, railway, road and other large infrastructure projects, this combination of factory prefabrication and modular configuration can deliver infrastructure project accommodation at scale, even when the available site area is limited.<\/p>\n<h2><strong><b>\u0646\u062a\u0627\u0626\u062c \u0627\u0644\u0645\u0634\u0631\u0648\u0639<\/b><\/strong><\/h2>\n<p>The Chile metro construction project used 132 flat pack container house units to establish a combined site office and worker accommodation facility. The completed facility includes two-storey office buildings, single-storey accommodation blocks and shared outdoor recreation space, all based on the same prefabricated container house system.<\/p>\n<p>For infrastructure projects where a large team needs to work and live close to the construction area, the Chile project demonstrates how a modular construction camp can combine offices, accommodation and shared facilities within one coordinated site solution. For even larger-scale programmes, GS Housing&#8217;s Saudi SDW project applied the same approach across a 557-unit <a href=\"https:\/\/gshousing.com\/ar\/modular-construction-camp-saudi-arabia-sdw\/\"><strong><b>modular construction camp<\/b><\/strong><\/a>, including dedicated client offices, EPC offices and workforce accommodation.<\/p>\n<h2><strong><b>\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629<\/b><\/strong><\/h2>\n<h3><strong>What is construction site accommodation?<\/strong><\/h3>\n<p>Construction site accommodation refers to facilities established near a construction project to provide working and living space for project personnel. Depending on the project, these facilities may include offices, worker accommodation, meeting spaces and shared recreation areas.<\/p>\n<h3><strong>How many units were used for the Chile metro project?<\/strong><\/h3>\n<p>GS Housing supplied 132 flat pack container house units for the Chile metro construction project. The units were configured as site offices, workforce accommodation and shared facilities within one modular construction camp.<\/p>\n<h3><strong>How are offices and accommodation combined in one modular facility?<\/strong><\/h3>\n<p>The same prefabricated container house system can be configured for different functions. In the Chile metro project, two-storey buildings with glass facades served as offices, while single-storey blocks with individual access doors served as accommodation. Shared outdoor space was provided between the buildings.<\/p>\n<h3><strong>Can offices and worker accommodation be located in the same camp?<\/strong><\/h3>\n<p>Yes. The Chile metro project combined both within one facility: two-storey office buildings and single-storey accommodation blocks were arranged as separate functional zones, connected by paved walkways and shared outdoor space. This keeps the entire project team on one site while maintaining a clear separation between work and living areas.<\/p>\n<h3><strong>What should infrastructure project managers consider when planning site accommodation?<\/strong><\/h3>\n<p>Key considerations include total workforce size, the required office-to-accommodation ratio, available site area, access routes, shared facilities, local climate and the project schedule. These factors help determine the appropriate modular configuration and site layout.<\/p>\n<h2><strong><b>Looking for Construction Site Accommodation?<\/b><\/strong><\/h2>\n<p>The Chile metro project shows how 132 flat pack container house units can be configured into a complete construction site accommodation solution, combining site offices, workforce accommodation and shared facilities for a large infrastructure project.<\/p>\n<p>If you are planning a metro, railway, road or other infrastructure project and need to house and office a project team, tell us where your project is, how many people you need to accommodate, and what balance of office and living space the site requires. GS Housing can configure modular accommodation for infrastructure projects based on your workforce size and site conditions. <a href=\"https:\/\/gshousing.com\/ar\/contact\/\"><strong><b>\u0627\u062a\u0635\u0644 \u0628\u0634\u0631\u0643\u0629 GS Housing<\/b><\/strong><\/a>\u00a0and we can work through the layout with you.<\/p>\n<\/div><\/div><\/div><\/div><\/div><div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-2 fusion-flex-container nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-sizes-top:1px;--awb-border-sizes-bottom:1px;--awb-border-sizes-left:1px;--awb-border-sizes-right:1px;--awb-border-color:#e3eaf2;--awb-border-radius-top-left:8px;--awb-border-radius-top-right:8px;--awb-border-radius-bottom-right:8px;--awb-border-radius-bottom-left:8px;--awb-overflow:hidden;--awb-padding-top:28px;--awb-padding-right:28px;--awb-padding-bottom:1.998000000000001px;--awb-padding-left:28px;--awb-background-color:#ffffff;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"max-width:1248px;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-1 fusion_builder_column_1_3 1_3 fusion-flex-column fusion-flex-align-self-center\" style=\"--awb-bg-size:cover;--awb-width-large:33.333333333333%;--awb-margin-top-large:0px;--awb-spacing-right-large:5.76%;--awb-margin-bottom-large:20px;--awb-spacing-left-large:5.76%;--awb-width-medium:33.333333333333%;--awb-order-medium:0;--awb-spacing-right-medium:5.76%;--awb-spacing-left-medium:5.76%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-image-element\" style=\"text-align:center;--awb-max-width:160px;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);\"><span class=\"fusion-imageframe imageframe-none imageframe-1 hover-type-none\"><img decoding=\"async\" width=\"1200\" height=\"1200\" alt=\"Henry Fu\" title=\"Henry Fu\" src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Henry-Fu.webp\" data-orig-src=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Henry-Fu-1200x1200.webp\" class=\"lazyload img-responsive wp-image-11357\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%271254%27%20height%3D%271254%27%20viewBox%3D%270%200%201254%201254%27%3E%3Crect%20width%3D%271254%27%20height%3D%271254%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Henry-Fu-200x200.webp 200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Henry-Fu-400x400.webp 400w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Henry-Fu-600x600.webp 600w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Henry-Fu-800x800.webp 800w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Henry-Fu-1200x1200.webp 1200w, https:\/\/gshousing.com\/wp-content\/uploads\/2026\/09\/Henry-Fu.webp 1254w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 640px) 100vw, 400px\" \/><\/span><\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-2 fusion_builder_column_2_3 2_3 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:66.666666666667%;--awb-margin-top-large:0px;--awb-spacing-right-large:2.88%;--awb-margin-bottom-large:20px;--awb-spacing-left-large:2.88%;--awb-width-medium:66.666666666667%;--awb-order-medium:0;--awb-spacing-right-medium:2.88%;--awb-spacing-left-medium:2.88%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-title title fusion-title-1 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-text-color:#555555;--awb-margin-top-small:10px;--awb-margin-right-small:0px;--awb-margin-bottom-small:10px;--awb-margin-left-small:0px;--awb-font-size:16px;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;font-size:1em;\">ABOUT THE AUTHOR<\/h2><\/div><div class=\"fusion-text fusion-text-2\" style=\"--awb-font-size:24px;--awb-text-color:#151515;--awb-margin-top:-20px;\"><p>Henry Fu<\/p>\n<\/div><div class=\"fusion-text fusion-text-3\" style=\"--awb-font-size:16px;--awb-text-color:#333333;--awb-margin-top:-20px;\"><p>General Manager, International Division of GS Housing<\/p>\n<\/div><div class=\"fusion-text fusion-text-4 fusion-text-no-margin\" style=\"--awb-font-size:15px;--awb-text-color:#555555;--awb-margin-top:-18px;--awb-margin-bottom:-3px;\"><p>International business and project experience with a focus on client collaboration and project development.<\/p>\n<\/div><div style=\"text-align:left;\"><a class=\"fusion-button button-flat fusion-button-default-size button-custom fusion-button-default button-1 fusion-button-default-span fusion-button-default-type\" style=\"--awb-margin-top:-1px;--awb-margin-left:-29px;--button_accent_color:#1597d4;--button_border_color:#1597d4;--button_accent_hover_color:var(--awb-color1);--button_border_hover_color:var(--awb-color1);--button_gradient_top_color:#ffffff;--button_gradient_bottom_color:#ffffff;--button_gradient_top_color_hover:hsla(var(--awb-color5-h),calc(var(--awb-color5-s) - 5%),calc(var(--awb-color5-l) - 10%),var(--awb-color5-a));--button_gradient_bottom_color_hover:hsla(var(--awb-color5-h),calc(var(--awb-color5-s) - 5%),calc(var(--awb-color5-l) - 10%),var(--awb-color5-a));--button_font_size:12px;\" target=\"_self\" href=\"https:\/\/gshousing.com\/ar\/authors\/henry-fu\/\" data-toggle=\"modal\" data-target=\".fusion-modal.0\"><span class=\"fusion-button-text awb-button__text awb-button__text--default\">View Author Profile \u2192<\/span><\/a><\/div><\/div><\/div><\/div><\/div><\/p>","protected":false},"excerpt":{"rendered":"<p> GS Housing supplied 132 flat pack container house units for the Chile metro project, combining site offices and workforce accommodation in one modular camp.<\/p>","protected":false},"author":13,"featured_media":11569,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[39],"tags":[41,346,49],"class_list":["post-11567","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-case","tag-flat-pack-container-house","tag-henry-fu","tag-modular-office-accommodation-modular-units"],"_links":{"self":[{"href":"https:\/\/gshousing.com\/ar\/wp-json\/wp\/v2\/posts\/11567","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gshousing.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gshousing.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gshousing.com\/ar\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/gshousing.com\/ar\/wp-json\/wp\/v2\/comments?post=11567"}],"version-history":[{"count":3,"href":"https:\/\/gshousing.com\/ar\/wp-json\/wp\/v2\/posts\/11567\/revisions"}],"predecessor-version":[{"id":11624,"href":"https:\/\/gshousing.com\/ar\/wp-json\/wp\/v2\/posts\/11567\/revisions\/11624"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gshousing.com\/ar\/wp-json\/wp\/v2\/media\/11569"}],"wp:attachment":[{"href":"https:\/\/gshousing.com\/ar\/wp-json\/wp\/v2\/media?parent=11567"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gshousing.com\/ar\/wp-json\/wp\/v2\/categories?post=11567"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gshousing.com\/ar\/wp-json\/wp\/v2\/tags?post=11567"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}